Dismantling
High resolution, about 3144x2088 pixels from 2400 dpi slide scans
(Photos by
Kirsten Sachs and
Michael Hauschild,
also available in 600 dpi high resolution)
A nice Place (Summer 2000)
The very last running Day of LEP and OPAL (2-Nov-2000)
Dismantling Work in the Gondolas (5-Dec-2000)
Cutting the very first Jet Chamber High Voltage cable (5-Dec-2000)
Interaction Zone (9-Feb-2001)
Electromagnetic Endcap Calorimeter (EE) (9-Feb-2001)
OPAL in Parts (9-Feb-2001)
Central Detector Pressure Bells (9-Feb-2001)
Central Detector open (16-Feb-2001)
Gondolas and Rucksacks (10-Feb-2001)
RN1 Controlroom (10-Feb-2001)
Cables (10-Feb-2001)
Pulling the Central Detector out of its Pressure Vessel (6-Mar-2001)
...and LEP (16-Feb-2001)
Lead Glass on the Surface (17-Jul-2001)
Central Detector Pressure vessel and the Coil (17-Jul-2001)
The very last Day of "The OPAL Pit" (17-Jul-2001)
Preparing the Central Detector for Display at a Musuem (October/November 2001)
...and LEP (16-Feb-2001)
Space for LHC... (17-Jul-2001)
Michael Hauschild 29-Nov-2001