******************************************************************** **** DBL_N_EM was disabled for 1997 running, and removed from **** **** the fourth LEVEL1 bit on 30.10.97. **** **** **** **** It was replaced by SNG_BCAL (/TAG_SNGC) for fills 4381 -> **** **** 4432; LEVEL1 downscaling was factor 2 and LEVEL3 passed **** **** all events (except fill 4381 - all rejected) **** ******************************************************************** A.E.Wright 18/11/97 ---------------------- Description : A new gamma-gamma trigger From : AXAONL::WERNERS Posted : 18-NOV-1996 13:59:10, Expires : 3-DEC-1996 13:59:10 CERN, 18-NOV-1996 During the last week several studies for a new gamma-gamma trigger, which will be used to check the efficiency of the TRK_CNT2 trigger, were performed. This new trigger, the DBL_N_EM, has been enabled at run 42615, it is situated on the fourth bit. In its final version it requires a coincidence of two ECal modules (threshold = 300 MeV per module) and the presence of the ITC_R_PHI_Z bit. The definition, the thresholds and the downscaling were changed several times during the last runs, and therefore the following lines should clarify the situation. DBL_N_EM: Run DownSc. Threshold [GeV] Definition 42615 40 0.18(EA)/0.21(EB) 0.15(BA) 2 ECW modules 42627 10 0.18(EA)/0.21(EB) 0.15(BA) --- " --- 42643 10 0.4 (EA)/0.4 (EB) 0.35(BA) --- " --- 42650 1 0.18(EA)/0.21(EB) 0.15(BA) 2 ECW mods. AND ITC_R_PHI_Z bit 42654 1 0.3 (EA)/0.3 (EB) 0.3 (BA) --- " --- In addition, the requirement for ITC_Back_to_Back bit has been changed: Instead of 1 vs. 3 sectors (out of 96) it is relaxed to 1 vs. 5 since run 42627. The only trigger which uses this bit is TRK_CNT2. Stefan