* General
Overview
Publicity
Contact
* Technical
Design
Documents
Instrumentation
Paper Archive
* Publications
Papers
Posters
Presentations
* Gallery
Illustrations
Photos
Video
* Status
Integration
Operation
Data Archive
Webcams
* Search
Site Search
* Links
CS Japan

Photos

Date Subject Photographer
* General Photos on ATLAS and its Magnet System
2008
05-Nov-2008 Solenoid Level Control Heater (spare)
22-Aug-2008 Solenoid and Toroids Running Together
21-Aug-2008 Control Dewar, Bus-bars and Control Room
Jun-2008 Bus-bar connection and Modification Current Lead Cooling Line
04-Jun-2008 Maintenance cryogenic system
16-May-2008 Replacement Bus-bar Connections and Cold Gas Return Lines
2007
24-Sep-2007 Bus-bar Segment 29 & 30
2006
04-Aug-2006 End of Commissioning Party
Aug-2006 Commissioning & Field Mapping
01-Aug-2006 Reached full field (2 T) Masanori Kawai
Jul-2006 Field Mapping Machine
10-Jul-2006 Repair Quench Line
Mar-2006 Flexible lines Jos Metselaar
13-Mar-2006 Transferline Jos Metselaar
07-Mar-2006 Cutting thermal/vacuum barriers of the transferline Jos Metselaar
06-Mar-2006 Positioning flexible transferline (cold gas) Jos Metselaar
27-Feb-2006 Positioning of the transferline Jos Metselaar
22-Feb-2006 Lowering the transferline into UX15 Jos Metselaar
Feb-2006 Final Closing Vacuum Bellows
Jan-2006 Finishing Chimney to Control Dewar Connection
2005
14-Dec-2005 Control Dewar Installation
Dec-2005 Chimney to Control Dewar Connection
Nov/Dec-2005 Chimney to Coil/Bulkhead Connection
25-Nov-2005 Preparation of Chimney to Coil Connection
08-Nov-2005 View of the Barrel Toroid after insertion of the Barrel Cryostat CERN Photo Archive
08-Nov-2005 View of the Calorimeter in final position CERN Photo Archive
04-Nov-2005 The installation team after movement completed CERN Photo Archive
04-Nov-2005 Solenoid and Barrel in Place
04-Nov-2005 Barrel Calorimeter Movement to Z=0 C. Marcelloni Oliveira
04-Nov-2005 View of the Barrel Toroid Completed CERN Photo Archive
03-Nov-2005 View of the Calorimeter from the Barrel Toroid CERN Photo Archive
03-Nov-2005 View of the Calorimeter before moving CERN Photo Archive
02-Nov-2005 Repositioning of the Chimney
18-Oct-2005 Setting of the Chimney inside the Barrel Toroid
18-Oct-2005 Chimney Installation J. Metselaar
Mar-2005 Cold Test Transfer Lines J. Metselaar
Feb-2005 Piping Valve Unit J. Metselaar
27-Jan-2005 Valve Unit Arrival in Point 1 and Lowering to USA15 J. Metselaar
20-Jan-2005 Vacuum Piping in UX15 and Control Dewar in Hall 180 J. Metselaar
20-Jan-2005 Removal of PCS from the Bunker
05-Jan-2005 Survey of Tile Calorimeter and Barrel Cryostat A. Behrens
2004
10-Dec-2004 Barrel Cryostat and Tile Calorimeter CERN Photo Archive
28-Oct-2004 Descent of the Cryostat from SX1 into UX15 C. Fabre
28-Oct-2004 Descent of the Cryostat into UX15 CERN Photo Archive
28-Oct-2004 Descent of the Cryostat from SX1 CERN Photo Archive
28-Oct-2004 Barrel Cryostat Before the Descent CERN Photo Archive
27-Oct-2004 Transport Cryostat from Bat.180 to Point 1 C. Fabre
27-Oct-2004 Transport Cryostat from Bat.180 to Point 1 CERN Photo Archive
16-Oct-2004 CERN Open Day CERN Photo Archive
Jul-2004 On-surface Test
Jun-2004 Cooldown
11-Jun-2004 Barrel Cryostat C. Fabre
Mar-2004 Bulkhead Assembly and Cryostat Closure
Feb-2004 Installation in the Barrel Cryostat
Feb-2004 Insertion Coil into Barrel Calorimeter
26-Feb-2004 Insertion into the Barrel Cryostat (Video) Yasuhiro Makida
26-Feb-2004 Insertion into the Barrel Cryostat Akira Yamaguchi
6-Feb-2004 Insertion into the Barrel Cryostat (Test) CERN Photo Archive
16-Jan-2004 Setting on the cryostat insertion beam
16-Jan-2004 Setting on the cryostat insertion beam CERN Photo Archive
16-Jan-2004 Alignment for the cryostat insertion beam CERN Photo Archive
16-Jan- 2004 Preparation for lifting CERN Photo Archive
16-Jan-2004 ATLAS Solenoid CERN Photo Archive
2003
13-Oct-2003 Alignment Survey
29-Aug-2003 Transport into clean room
25-Aug-2003 Transport from Bldg.609 to Bldg.180
Jun-2003 Extension chimney installation
2002
Jun-2002 Proximity cryogenics and chimney test
24-Jun-2002 Barrel Cryostat in Bat. 180 CERN Photo Archive
2002 Barrel Cryostat in Bat.180 LAr group
25-May-2002 Chimney to Control Dewar Connection
2001
13-Nov-2001 Transport from Bldg.180 to Bldg609
1-Oct-2001 Barrel cryostat installation model
1-Oct-2001 Acceptance test at CERN (2)
28-Sep-2001 Official reception at CERN KEK
28-Sep-2001 Official reception at CERN CERN Photo Archive
27-Sep-2001 Acceptance test at CERN (1)
7-Sep-2001 Unpacking proximity cryogenics
3-Sep-2001 Arrival of the ATLAS Solenoid from Japan CERN Photo Archive
10-Jul-2001 Barrel Cryostat in Bat.180
25-Jul-2001 Transportation from Japan to CERN
2000
26-Dec-2000 Factory Test
3-Dec-2000 Factory Test Photo Shima
21-Jun-2000 Barrel Cryostat CERN Photo Archive
25-May-2000 Factory Proximity Cryogenics Test Photo Shima
1999
21-Jun-1999 Construction and Test of the Barrel Cryostat CERN Photo Archive
1999 Coil on Inner Warm Vessel Photo Shima
1999 Coil Photo Shima
1999 Inner Warm Vessel Photo Shima
Conductor S. Mizumaki

ATLAS Magnet Group / Roger Ruber (2002-2007).
ATLAS | CERN