Minutes of CLIC meetings
in 2003:

24-Jan-2003
Talk at Damping Ring Workshop, Daresbury
Maxim Korostelev
10-Feb-2003
ESGARD information meeting

28-Feb-2003
Organization of the CLIC Study after the AC restructuring
Jean-Pierre Delahaye
14-Mar-2003 Progress in the Design of a Damped and Tapered Accelerating Structure for CLIC J-Y Raguin
21-Mar-2003
Effect of target emitted ions on the focal spot of an intense electron beam and impact on drive beam profile monitors
CLIC manpower plan 2003-2008
C. Vermare (CEA),  Thibaut Lefevre, Ian Wilson
28-Mar-2003
Emittance measurements and beam optimization using Laser Wire Scanners
Summary of Daresbury Damping Ring Workshop
Gregory Penn
Maxim Korostelev
04-Apr-2003
Review of CLIC activities 2002
Ian Wilson
11-Apr-2003
Numerical Study of Nonstationary Phenomena in Gyro-Oscillators
Alexej Grudiev
25-Apr-2003
A Demonstration of High-Gradient Acceleration
Walter Wuensch
02-May-2003
Colliding Nanobeams in CLIC with Magnets Stabilized to the Sub-nm Level
Bunch Frequency Multiplication in the CLIC Test Facility CTF3

Stefano Redaelli
Frank Tecker
09-May-2003
The design of high power, high efficiency, multi-beam klystrons
Jinjung Feng
23-May-2003
Local RF power switching in CLIC main linac
Igor Syratchev
06-Jun-2003
European Accelerator R&D and Linear Collider Steering Groups
Gilbert Guignard
13-Jun-2003
Beam Position Monitoring at CLIC
Jan Prochnow
20-Jun-2003
Analyses, measurements and experiments performed at EST-SM for the CLIC project
Gonzalo Arnau Izquierdo,
Sergio Calatroni and
Morten Kildemo
26-Jun-2003
Estimate the best accelerating gradient that we can expect, based on the knowledge that we have today
Walter Wuensch, Alexej Grudiev, Samuli Heikkinen
08-Jul-2003
Review of PILOT test results and the Photo-Injector Option for CTF3
Steve Hutchins, Guy Suberlucq
22-Aug-2003
Discussion of CLIC Beam Dynamics items.
What do we need to do to establish CLIC feasibility? How should we proceed with the work?
Daniel Schulte
01-Sep-2003
Status of CARE/ESGARD, Status of CARE/JRA3
Gilbert Guignard, Louis Rinolfi
05-Sep-2003
Recent Plasma Wakefield Experiments at SLAC
Patric Muggli
12-Sep-2003
Latest news from X-Band R&D at SLAC and the work being done by the US LC Steering Group
Dave Burke
19-Sep-2003
Some news concerning future CLIC studies
Ian Wilson
03-Oct-2003
Recent results on the design and optimization of CLIC main linac accelerating structure
Alexej Grudiev
24-Oct-2003
CTF3 Lost Beam Day
various
31-Oct-2003
PTC upgrade path for MAD-X
PTC: A polymorphic tracking code based on the polymorphic library FPP

Frank Schmidt, Etienne Forrest
28-Nov-2003
Drive Beam Generation and Main Beam RF Pulse-length,
Possibilities and Limitations

Roberto Corsini
05-Dec-2003
X-band RF structure work at Fermilab
Nikolay Solyak, FNAL
12-Dec-2003
Discussion of CLIC parameters
H.Braun, all
16-Dec-2003
CTF3 results 2003
R. Corsini, O. Forstner and F. Tecker



Back to the CLIC meeting Home page

Frank Tecker  - Last updated  06-01-2004