Minutes of CLIC meetings
in 2004:

05-Jan-2004
X-band high gradient testing at NLCTA
Steffen Döbert, SLAC
16-Jan-2004
NLC MAC Highlights
Jean-Pierre Delahaye
06-Feb-2004
Wake field simulations using GdfidL
A.Grudiev, D.Schulte, E.Jensen, I.Syratchev
13-Feb-2004
CLIC oriented analyses of TS-MME
G.Arnau Izquierdo, S.Calatroni, H.Neupert
20-Feb-2004
Ongoing work for a new parameter list
A.Grudiev, I.Syratchev, H.Braun
27-Feb-2004
UK Linear Collider R&D and Laser-wire Update

Grahame Blair, Royal Holloway University of London

05-Mar-2004
Beam dynamics driving the parameter choice
Daniel Schulte
12-Mar-2004 Discussion of CLIC parameters all
19-Mar-2004 1st Chamonix CLIC meeting
(invitation (pdf))
BB, CB, EB, HB, RC, GG, RL, TL
26-Mar-2004 Overview and Status of the Proposal to the CERN council of an
Accelerated programme to demonstrate the key CLIC feasibility issues before 2010
Ian Wilson, Jean-Pierre Delahaye
02-Apr-2004
Review of CLIC activities 2003 Ian Wilson
06-Apr-2004 BDI Forum: Status of beam profile monitor developments for CLIC T.Lefevre
30-Apr-2004 The Equilibrium Emittances of the CLIC Damping Ring with Short Period Wigglers,
Potential of Non-Standard Emittance Damping Schemes for Linear Colliders

Maxim Korostelev, Frank Zimmermann
07-May-2004 Multimoded RF Systems for X-band Future Linear Colliders Sami Tantawi, SLAC
14-May-2004 Review of 9th International ATF Collaboration Meeting and 3rd APAC,
e-cloud  in Linear Colliders
Frank Zimmermann
27-May-2004 Summary of the LCWS04 meeting Albert De Roeck
04-Jun-2004
New Developments in Beam-based Alignment Daniel Schulte
11-Jun-2004 Status of TTF2 and Microbunching Instability in Bunch Compressors Yujong Kim, DESY
18-Jun-2004 Optimization of CLIC main linac accelerating structure for 150 MV/m loaded accelerating gradient
Igor's comments on related PETS issues

A.Grudiev,
I.Syratchev
25-Jun-2004 Review of the Frascati ELAN workshop Gilbert Guignard, Daniel Schulte, Guy Suberlucq
02-Jul-2004 An Overview of the Structure Development Campaign Walter Wuensch
30-Jul-2004 Tendencies in the development of high-power gyrotrons G. Denisov, (IAP, GYCOM, Nizhny Novgorod)
06-Aug-2004
30 GHz Power Line and SLED-II Pulse Compressor for CTF3 S. Kuzikov,  (IAP, Nizhny Novgorod),
I.Syratchev
20-Aug-2004
Future Contributions to CLIC and CLIC*LHC Colliders by Ankara Group
Technology recommendation of the ITRP
K. Çiftçi, Ö. Yavaş and O. Çakır, Ankara University,
J.-P. Delahaye
27-Aug-2004 Results of CTF3 Run 2004/1 and Plans for Run 2004/2 R. Corsini, I. Syratchev, F. Tecker
30-Aug-2004 Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Options various
17-Sep-2004
EUROTeV Gilbert Guignard, Daniel Schulte
22-Oct-2004
Discussion of CLIC Parameters, 2nd Iteration all
25-Oct-2004 KEK Strategy for ILC Contributions Junji Urakawa / KEK
29-Oct-2004 Measurement and Compensation of Betatron Resonances at the PS Booster Synchrotron Peter Urschütz
05-Nov-2004 TS-MME Activities for CLIC G. Arnau-Izquierdo,  S. Sgobba
12-Nov-2004 Emittance Control for very short Bunches
Karl Bane / SLAC
19-Nov-2004 TS-MME Activities for CLIC
 (continuation of CLIC meeting  5 Nov. 2004)
S. Calatroni, M. Taborelli
22-Nov-2004 Review of the ILC  Workshop  KEK, Nov.13-15,
with summaries of the working groups
J.P.Delahaye, G.Guignard, F.Zimmermann, J.Gillies
03-Dec-2004
CLIC Power Extraction and Transfer Structure (PETS) I. Syratchev
06-Dec-2004 RF gun development at SPring-8 H. Hanaki / SPRING8



Back to the CLIC meeting Home page

Frank Tecker  - Last updated  07-12-2004