Minutes of CLIC meetings
in 2006:

13-Jan-2006
Summary of ILC-GDE Frascati meeting D. Schulte, J-L. Baldy
27-Jan-2006 Investigations of DC Breakdown Fields T. Ramsvik
03-Feb-2006
High-gradient Test Results of the 30 GHz Mo-Iris Structure
The New RF and High-speed Acquisition Systems for High-Gradient Tests

A. Rodriguez,
R. Fandos, S. Doebert
10-Feb-2006 Results from CTF3 Beam Operation and Commissioning in 2005 R. Corsini, S. Döbert, C. Welsch
17-Feb-2006 Status of the Fatigue Studies of the CLIC Accelerating Structures S. Calatroni,
S. Heikkinen
24-Feb-2006 Beam Dynamic Issues at the CTF3 Linac and Delay Loop
Some Results on CTF3 Beam Instrumentation
P. Urschütz,
T.Lefevre
03-Mar-2006 Review of CLIC activities 2005 I. Wilson
10-Mar-2006 Status of 30GHz Beam Phase Measurement System A. Andersson, J. Sladen
17-Mar-2006 Halo  Studies for CLIC L. Neukermans
28-Mar-2006 CLIC Parameter Away-Day

13-Apr-2006 The Scaling of the Traveling-Wave RF Breakdown Limit W. Wuensch
27-Apr-2006 Update of CLIC organisation J.P.Delahaye,  H.Braun , R.Corsini, D.Schulte, G.Geschonke, W.Wuensch
05-May-2006
A study on Production of Bimetallic Raw Materials for the CLIC Accelerating Structures,  Status Report G. Arnau Izquierdo
19-May-2006 Tracking with Collimator Wake-Fields through the CLIC BDS G.Rumolo, A.Latina
02-Jun-2006
Results of last CTF3 run
R.Corsini, F.Tecker, S.Doebert
09-Jun-2006 Non-linear Optimization of the CLIC BDS
R. Tomás
16-Jun-2006 First conceptual design of a post-collision beam line for CLIC A. Ferrari
23-Jun-2006 The PHIN Photoinjector for the CTF3 Drive Beam
R. Losito, G. Hirst
30-Jun-2006 30 GHz accelerating structures results
A. Rodriguez, G. Arnau Izquierdo, W. Wuensch
14-Jul-2006
CLIC & CTF3-Linac PETS
Igor Syratchev
28-Jul-2006 Optics Design and Performance of an Ultra-Low Emittance Damping Ring for the CLIC Maxim Korostelev
25-Aug-2006 News from the Linear Collider Physics Group in PH Department Dieter Schlatter
08-Sep-2006
3 GHz and 30 GHz Conditioning Programs Alexey Dubrovskiy
15-Sep-2006 Highlights of LINAC'06 Conference
Summary of Experimental Results for the Cu HDS60 Structure

Günther Geschonke, Steffen Döbert, Alberto Rodriguez
22-Sep-2006 The CLIC Active-Prealignment Studies Hélène Mainaud-Durand
29-Sep-2006 The E166 Experiment - Polarized Positrons for the ILC Jan Kovermann  /  RWTH Aachen
06-Oct-2006
Status of the CLIC Bunch Compressor work at PSI Frank Stulle / PSI
13-Oct-2006 New Mathematical Modelling of Ultra-Relativistic Charge Prof. Robin Tucker / Lancaster University and Cockroft Institute
13-Oct-2006 Double way interface between HFSS and ANSYS Grzegorz Zelek /
Cracow University of Technology  and TS-MME
20-Oct-2006 Kicker Systems for CTF3 & CLIC Mike Barnes /  AB-BT
03-Nov-2006
Update on Beam Based Alignment methods for the CLIC Main Linac Andrea Latina
17-Nov-2006 CLIC tunnel layout
Carlo Wyss
08-Dec-2006
CLIC Tuning Bump Strategies Peder Eliasson
18-Dec-2006 Status of the Precision Beam Position Monitor (PBPM) for EUROTeV
Status of the Wall Current Monitor (WCM) design for EUROTeV

Ivan Podadera Aliseda, Alessandro D'Elia


Back to the CLIC meeting Home page

Frank Tecker  - Last updated  18-12-2006