13-Jan-2006
|
Summary of
ILC-GDE Frascati meeting |
D.
Schulte, J-L. Baldy |
27-Jan-2006 |
Investigations of DC Breakdown
Fields |
T. Ramsvik |
03-Feb-2006
|
High-gradient
Test Results of the 30 GHz Mo-Iris
Structure
The New
RF
and High-speed Acquisition Systems for High-Gradient Tests
|
A. Rodriguez,
R.
Fandos, S. Doebert
|
10-Feb-2006 |
Results
from CTF3 Beam Operation and Commissioning in 2005 |
R. Corsini, S. Döbert, C.
Welsch |
17-Feb-2006 |
Status of
the Fatigue Studies of the CLIC
Accelerating
Structures |
S. Calatroni,
S. Heikkinen |
24-Feb-2006 |
Beam
Dynamic Issues at the CTF3 Linac and Delay Loop
Some Results on CTF3 Beam Instrumentation |
P. Urschütz,
T.Lefevre |
03-Mar-2006 |
Review of
CLIC activities 2005 |
I. Wilson |
10-Mar-2006 |
Status of
30GHz Beam Phase Measurement System |
A. Andersson,
J. Sladen |
17-Mar-2006 |
Halo Studies
for CLIC |
L. Neukermans |
28-Mar-2006 |
CLIC
Parameter Away-Day
|
|
13-Apr-2006 |
The
Scaling of the Traveling-Wave RF Breakdown
Limit |
W. Wuensch |
27-Apr-2006 |
Update of
CLIC organisation |
J.P.Delahaye, H.Braun ,
R.Corsini, D.Schulte,
G.Geschonke, W.Wuensch |
05-May-2006
|
A study
on Production of Bimetallic Raw Materials
for the CLIC Accelerating Structures,
Status Report |
G. Arnau Izquierdo |
19-May-2006 |
Tracking
with Collimator Wake-Fields through the CLIC BDS |
G.Rumolo, A.Latina |
02-Jun-2006
|
Results
of last CTF3 run
|
R.Corsini, F.Tecker, S.Doebert
|
09-Jun-2006 |
Non-linear
Optimization of the CLIC BDS
|
R. Tomás
|
16-Jun-2006 |
First
conceptual
design of a post-collision beam line for
CLIC |
A. Ferrari
|
23-Jun-2006 |
The PHIN
Photoinjector for the CTF3 Drive Beam
|
R. Losito, G.
Hirst
|
30-Jun-2006 |
30 GHz
accelerating structures results
|
A. Rodriguez, G. Arnau
Izquierdo, W. Wuensch
|
14-Jul-2006
|
CLIC
&
CTF3-Linac PETS
|
Igor Syratchev
|
28-Jul-2006 |
Optics
Design and Performance of an Ultra-Low
Emittance Damping Ring for the CLIC |
Maxim Korostelev
|
25-Aug-2006 |
News from
the Linear Collider Physics Group in
PH Department |
Dieter Schlatter |
08-Sep-2006
|
3 GHz and
30
GHz Conditioning Programs |
Alexey Dubrovskiy |
15-Sep-2006 |
Highlights
of LINAC'06
Conference
Summary
of Experimental Results for the
Cu HDS60 Structure
|
Günther Geschonke,
Steffen Döbert, Alberto
Rodriguez |
22-Sep-2006 |
The CLIC
Active-Prealignment
Studies |
Hélène
Mainaud-Durand |
29-Sep-2006 |
The E166
Experiment - Polarized
Positrons for the ILC |
Jan Kovermann / RWTH Aachen |
06-Oct-2006
|
Status of
the CLIC Bunch Compressor work at PSI |
Frank Stulle / PSI
|
13-Oct-2006 |
New
Mathematical Modelling of
Ultra-Relativistic Charge |
Prof. Robin Tucker /
Lancaster University and Cockroft Institute |
13-Oct-2006 |
Double
way interface between HFSS
and ANSYS |
Grzegorz Zelek /
Cracow University of Technology and TS-MME |
20-Oct-2006 |
Kicker Systems
for CTF3 & CLIC |
Mike Barnes / AB-BT |
03-Nov-2006
|
Update on
Beam Based Alignment
methods for the CLIC Main Linac |
Andrea Latina |
17-Nov-2006 |
CLIC tunnel
layout
|
Carlo Wyss
|
08-Dec-2006
|
CLIC Tuning
Bump Strategies |
Peder Eliasson |
18-Dec-2006 |
Status of
the Precision Beam Position Monitor (PBPM) for
EUROTeV
Status of
the Wall Current Monitor (WCM) design for EUROTeV
|
Ivan Podadera Aliseda,
Alessandro
D'Elia |