L3 Internal Notes from 1983
- L3 note 122.
W Wallraff
Hadron Calorimeter Meeting,CERN
- L3 note 123.
Minutes of the fourth BGO-Europe Meeting
- L3 note 124.
SCC Ting
Sam's talk at January L3 Meeting
- L3 note 125.
M VanDriel
Linearity and resolution of Photodiodes
- L3 note 126.
J Toth
Muon Det. array structure, final report
- L3 note 131.
M Cerrada,.
Prelim.Results from BGO optical MC
- L3 note 133.
R Weill
Lausanne Status Report on BGO
- L3 note 134.
Summary of Work Distribution of Group B
- L3 note 135.
M Chen
MC Simulation and Optimization of the L3 Detector (at L3 General Meeting)
- L3 note 136.
A Herve
Calorimeter Engineering Meeting No 1
- L3 note 137.
G Gianolli,.
First step analysis of the data from the Hadron Calorimeter test 1 (1982)
- L3 note 138.
Notes from January BGO Meeting
- L3 note 139.
Minutes + Notes from February Online +Trigger group Meeting(see#162-174)
- L3 note 140.
A Nikitine
Spherical Approach to Hadron Calori- meter and BGO
- L3 note 141.
Hadron Cal. Structure+Assembly: ITEP- Design (CERN/EP/L3/AN/vg)
- L3 note 142.
M Steuer
L3-Hadron Calorimeter Minutes+Reports presented Feb22+23(see#136/7,140/1,157)
- L3 note 143.
H Newman
L3 Computing Meeting #3 Feb.15-16,83
- L3 note 144.
Minutes of 5th BGO 'Riverains' Meeting
- L3 note 145.
M Harris
L3 drawings, March version
- L3 note 146.
J Fehlman
WIRCHA:program package to simulate drift Chambers
- L3 note 147.
P Lecomte
The X3A Test Beam Area for L3
- L3 note 148.
J P Martin
The X3 Test Beam Project (Note 1) (EP/L3/087S)
- L3 note 149.
J Burger
Tentative L3 cabling scheme + control room layout
- L3 note 150.
A Nikitine
Variations of Calorimeter Frame and Cal.Modules,Transport to Assembly zone (EP/L3/0088S)
- L3 note 152.
G Gianolli
Messungen am Test Hadronkalorimeter fur L3 (diploma thesis)
- L3 note 153.
B Bleichert
L3 Hadron Calorim. Meeting, Summary+ Reports presented(see#147,177)
- L3 note 154.
E Longo
BGO Software Meeting
- L3 note 155.
M Pohl
Comments from M.Pohl on the TEC
- L3 note 156.
PS Test configuration, more information from TATINA
- L3 note 157.
MC-Simulation for Hadron Calorim. Test
- L3 note 158.
U Becker
Size Parameter Request of Chamber Group
- L3 note 159.
M Harris
Loading and unloading Zones in the Exp- erimental Hall and the effect on the Position of the interaction point
- L3 note 160.
M Harris
Experimental Hall Layout+Parameter- Drawings
- L3 note 162.
A Fucci
Presentation of the 3081/E Project
- L3 note 163.
P J Ponting
FASTBUS(EP-Electronics 83-01)
- L3 note 164.
P Bahler
Expandaple Online Processor
- L3 note 165.
E GABATHULER
Information Meeting on FASTBUS (EP- Electronics 82-03)
- L3 note 166.
M Fukushima
Estimate on Cosmic Ray Trigger
- L3 note 167.
M Fukushima, R Mount
Cosmic Rays/Trigger Counters
- L3 note 168.
M Fukushima
What to be triggered
- L3 note 169.
D Fong
LEP3 Online DAQ and Monitoring
- L3 note 170.
P Lecomte
Trigger Logic
- L3 note 171.
L Hertzberger
Muon Trigger and Detector
- L3 note 172.
F Bruyant
Online/Offline Integration
- L3 note 173.
R Sumner
Trigger for the BGO calorimeter
- L3 note 174.
M White
Summary Group J Meeting 24/25 Feb
- L3 note 175.
D Fong,
Minutes of L3 Online Group Discussions March 7,8
- L3 note 176.
J Burger
see 149 (the same)
- L3 note 177.
P Lecomte,
Analog and Trigger electronics for the L3 Hadron Calorimeter
- L3 note 178.
M Steuer
Executive Committee Notes#1
- L3 note 179.
M Steuer
Executive Committee Notes#2
- L3 note 180.
M Steuer
CERN March 23 General Meeting:Copies of all Transparencies, also single talks available:#181-#197
- L3 note 181.
L Leistam
Magnet + Experimental Area
- L3 note 182.
F Wittgenstein
Magnet:Who is doing What
- L3 note 183.
A Herve
L3 Magnetic Structure
- L3 note 184.
D Gusewell
CERN SAFETY
- L3 note 185.
U Becker
Muon Chamber Group Report
- L3 note 186.
G Viertel
Status Report on Gas Studies at ETH-Z
- L3 note 187.
P Seiler
UV-Laser Calibration of TEC
- L3 note 188.
K Lubelsmeyer
Report on the Hadron Calorimeter
- L3 note 189.
C F He
Long BGO Crystal Growth
- L3 note 190.
M Vivargent
Report on the Production of BGO
- L3 note 191.
M Lebeau
L3 BGO Calorimeter
- L3 note 192.
R Sumner
Report on Electronics for BGO-Readout
- L3 note 193.
D Schmitz
BGO-MC Simulation
- L3 note 194.
M Chen
Report on the MC-Studies
- L3 note 195.
D Fong
Report on On-line Analysis+Trigger
- L3 note 196.
J Burger
Counting House Request
- L3 note 197.
H Newman
Off-line Analysis+Processing Computer
- L3 note 199.
M Schneegans
Organization of BGO Beam Tests(CERN/X3)
- L3 note 200.
M Steuer
Summary of L3-Experiment+perspective Drawing(CERN/EP/0190d/L3)
- L3 note 203.
R Sumner
The organization of the BGO readout and trigger system
- L3 note 204.
R Sumner
Radiation Tests of MC146805G2 CMOS
- L3 note 205.
M Isaila,.
Preliminary report on studies of photo- diodes and preamps for the BGO-Calorim.
- L3 note 206.
M Harris
Hadron Cal Engineering Meeting No 2
- L3 note 207.
M Schneegans
Minutes 6.BGO 'CERN Riverains' Meeting
- L3 note 208.
P Duinker,.
Muon Chamber Supportsystem
- L3 note 209.
M Longo
Design Considerations for the L3 Hadron Calorimeter UM LEP-3 Note 1
- L3 note 210.
B Roe
Some Comments on Punch Through UM LEP-3 Note 2
- L3 note 211.
SCC Ting
L3 Technical Proposal
- L3 note 212.
SCC Ting
Open Presentation of Techn.Proposal
- L3 note 213.
B Bleichert
Hadron Calorimeter Meeting
- L3 note 214.
L Leistam
Vacuum Chamber Meeting #1
- L3 note 215.
M Harris
Parameter+Assembly Meeting #1
- L3 note 216.
R Brown
2nd Meeting on Gases for LEP(SAFETY) (EF/1475M/RCAB/mk)
- L3 note 217.
M Tonutti,.
L3 Vertex Chamber Group Meeting(ETH-Z)
- L3 note 218.
E Gabathuler,.
Computing at CERN in the LEP era (LCPG/dow/83/1)
- L3 note 219.
D Plane,.
X3 BEAM (general description)
- L3 note 220.
G Kellner,.
Minutes of the LEP Collaborations Software Meeting SW/83 # 1 --> # 9 SW/84 # 1 --> # 11
- L3 note 221.
D Plane
The West Area Beams(CERN/SPS/83-22)
- L3 note 222.
M Harris
Parameter+Assembly Meeting #2
- L3 note 223.
M Schneegans,.
Notes of BGO Meeting July 5-7,83
- L3 note 224.
R Mount
L3 off-line meeting,CERN,Jul 7-9
- L3 note 226.
G Alverson,.
Muon Chamber Workshop, NIKHEF,Jul 11-15
- L3 note 227.
M Steuer
Hadron Calorimeter Meeting,CERN,July 4
- L3 note 228.
R Weill
Thermal uncertainties for e,gamma shower energy measurements in BGO
- L3 note 229.
P Lecoq
Evaluation of 25 BGO Crystals from La- boratory tests(CERN/EP/0232d/L3/PL/tdn)
- L3 note 230.
J Sens,.
Phase transitions in a BGO compound
- L3 note 231.
H Newman,.
CALTECH / L3 BGO development
- L3 note 232.
EXP Delphi
DELPHI Technical Proposal
- L3 note 233.
L Urban
Detector Simulation Meeting CERN Aug.31
- L3 note 234.
Y Kamyskov
Hadron Cal. Meeting CERN Aug.30,31
- L3 note 235.
M Harris
Parameter Assembly Meeting #3, CERN
- L3 note 236.
EXP Aleph
ALEPH Technical Proposal
- L3 note 237.
H Newman
Offline Computing Meeting CERN Sept.3
- L3 note 238.
M Steuer
L3 General Meeting CERN Sept.1,2
- L3 note 239.
EXP Opal
OPAL Technical Proposal
- L3 note 240.
M Steuer
Had.Cal.Meeting ITEP(Moscow),Oct.25-28
- L3 note 241.
M Steuer
Executive Committee Notes#3
- L3 note 242.
H Overas
SAFETY Guide for CERN Experiments vol.1
- L3 note 243.
U Becker,.
Civil Engineering Parameters
- L3 note 244.
G Bobbink,.
Radiation Damage of long BGO crystals (CMU-HEP83-13)
- L3 note 245.
A Arefiev,.
Wire,Pad and Direct Cathode Readout of Streamer Tubes (ITEP-151)
- L3 note 246.
P Seiler,.
Measurments of UV laser beam profiles with CCD's.(MIT/L3 internal note)
- L3 note 247.
R Meisel,.
Minutes of the L3 Muon Chamber Group Meeting MADRID
- L3 note 248.
J Salicio,.
Reports Group B meeting CERN, Nov.30
- L3 note 249.
M Steuer,.
Reports Group G meeting CERN, Nov.30
- L3 note 250.
M Steuer,.
L3 General Meeting CERN, Dec.1,2
- L3 note 251.
M Harris
Parameter+Assembly Meeting #4, CERN
- L3 note 252.
M Lebeau,.
Status of BGO Mechanical Structure
- L3 note 253.
M Fukushima
Transp. meeting CERN, Nov.30+Dec.03
- L3 note 254.
B Roe
Comments on Hadron Calorimeter
- L3 note 256.
A Arefiev,.
Gas Sampling Calorimeter working in the Streamer Mode (ITEP-150)
- L3 note 259.
H Bian,.
A Monte Carlo Simulation of BGO light collection
- L3 note 274.
B Adeva,.
Summary of Recent Exp. Results MARK J
- L3 note 276.
R Bopp,.
Tests with a Small Scale TEC
- L3 note 277.
J Paradiso
Compilation of Data on current TEC Analog Electronics
- L3 note 284.
B Roe
HETC M.C. Comparison with FNAL-E613 Test Calorimeter Data(UM LEP-3 Note 6)
- L3 note 309.
LEP Design Report Vol.1 The LEP Injector Chain
- L3 note 340.
LEPC
LEP Experiments Committee Minutes of LEPC Meetings #A +#08 ->#10
Laurence Barrin L3 Secretariat