(left) View of the 16-channel test station from Duke being assembled
and (right) IU tension
test station computer.
Module 1-01 irradiated in Dubna can be seen in the center on a table
behind the tension and
stringing computer.
An empty desk (left) and the gas leak test station computer in the back.
This one has a CD
burner installed. The X-ray mapper will be installed to the left of
this desk.
The receiving station near the entrance door. This computer will have
the central data base
and the printer. To the right, one can see the flat table which will
be used for the dimensional
tests. To the left, but not visible on this picture, there will be
the racks for storage of the
modules, not yet built. Note the squeaky clean floor!
Here is a closer look at the Duke 16-channel tension tester setup taken on Oct 1st 2002: