Proton Synchrotron Straight Section 98


Section 97 Sector 9 overview Section 99

Section drawing (EDMS)
A look from the other side

PS SS98

PR.SS98 Layout database

The transverse feedback PU is installed at the left end of the section.
On the blue table, a pick-up to investigate the 'electron cloud effect'.

The transverse feedback PU is installed at the left end of the section. See also the cabling diagram.
On the blue table, a pick-up to investigate the 'electron cloud effect', which occurs at high beam intensity and with closely spaced bunches. If there are too many free electrons in the vacuum pipe, the beam will be lost.
The cabling attached to the blue table serves the Wideband Electrostatic PU, which is now installed in SS94.



Comments? Mail
Pictures: Courtesy of Maximilien Chefdeville & Simon Mataguez
Updated: Tuesday, April 14, 2020 @ 01:40pm
Copyright CERN