PWG2 MC production requests page
In this page we propose and discuss the new MC production requests from PGW2 and we summarize the requests that were already finished.
Current production requests
Therminator, Pb+Pb, centrality 20-30%, 20k events
Details of the production:
AliRoot v4-17-Release, Therminator mode, residual misalignment
Status: validated with v4-17-Release, accepted by the PB
HIJING 25k events, for phi v2
Details of the production: HIJING model,
AliRoot v4-17-Release, residual misalignment
Status: request submitted, accepted by the PB
Production requests under consideration
EPOS, pp 900 GeV, 2M events
Details of the production:
AliRoot v4-17-Release, EPOS model
Status: EPOS model in
AliRoot, stil validating simulation scripts
This production is intended as a cross-check for the Pythia based models that we have used so far. It should show consistency with other productions and available data at this energy.
EPOS, pp 7 TeV, 2M events
Details of the production:
AliRoot v4-17-Release, EPOS model
Status: EPOS model in
AliRoot, stil validating simulation scripts
This production is intended as a prediction from EPOS for the maximum LHC energy this year. Again it is intended as an alternative prediction for the Pythia-based models.
Therminator, Pb+Pb, centrality 0-5%, 20k events
Details:
AliRoot v4-17-Release, residual misalignment
Status: should be easy to set up, as the configuration is identical to the 20-30% case with minimal changes
It is intended as a continuation of the Pb+Pb prodcution validation. Therminator includes freeze-out coordinates (critical for Femto) and natural elliptic flow (important for Flow). It also has strongly decaying resonances. This request should also be the most strict test for reconstruction, as it has maximum multiplicity.
Therminator, Pb+Pb, centrality scan 5-10%, 10-20%, 30-40%, 40-50%, 20k events each
Details:
AliRoot v4-17-Release, residual misalignment
Status: should be easy to set up, as the configuration is identical to the 20-30% case with minimal changes
A complete scan of centrality bins from Therminator, intended as complementary to 20-30% and central samples.
--
AdamKisiel - 2009-08-27