  • (TO DO) Inventory of all the hardware of the Pixel Trigger

  • (DONE) Installation of full system at point 2
    • (DONE) Installation of power bus for side a in PIT crate with 6 power cables
    • (DONE) Install all Zarlink optical modules on the OPTIN boards
    • (DONE) Program Control FPGA and Processing FPGA of board V1, OPTIN boards (in DSF) with latest firmware (available on G:/Users/g/gaglieri/public/programming_files/)
    • (DONE) Verify that all channels on the OPTIN boards receive optical signals and lock onto the G-LINK coming from the MPT card runnign the MCM emulator
    • (DONE) Long term BER tests of the OPTIN boards
      • Memory access tests
      • *(DONE)*Fast-OR transmission tests with the MPT board/MCM emulator
    • (DONE) Insert OPTIN boards in the JTAG chain of BRAIN board by setting jumpers properly
    • (DONE) repair (substitution) of the faulty Agilent chip on the OPTIN board that is in the DSF installed on the V1 board
    • (DONE) verify correspondence between HS in the SPD control and HS in the PIT control. This can be done by setting test pulses on the chip of a given HS, sending internal triggers and counting Fast-OR seen by the pit counters

Edit | Attach | Watch | Print version | History: r6 < r5 < r4 < r3 < r2 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r6 - 2009-07-08 - CesarMatos
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    AliceSPD All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback