TOF crates
Before 15/07/2006
- 5 chassis
- DC/DC for 4 crates
- 1 Maciste
- 1 Macistino
15/07/2006 : sent 2 DC/DC back to CAEN to be repaired
- 5 chassis
- DC/DC for 2 crates
- 1 Maciste
- 1 Macistino
18/07/2006 : 4 chassis delivered
- 9 chassis
- DC/DC for 2 crates
- 1 Maciste
- 1 Macistino
26/07/2006
- 9 chassis
- DC/DC for 3 crates
- 1 Maciste
- 2 Macistino
09/08/2006 : 1 chassis delivered, 1 Back to caen for tests, 1 DC/DC "Trittico" deliveres
- 9 chassis
- DC/DC for 4 crates
- 1 Maciste
- 2 Macistino
28/08/2006: 2 DC/DC Trittico, 1 Macistino delivered
1/09/2006: 1 Maciste back to CAEN
22/11/2006
- 3 chassis
- DC/DC for 3 crates
- 3 Maciste
A2818/V2718
5 V2718 (moused) + 2 A2818
1 V2718 with PECL driver modified
11 A2818 (from TOF tender)
TRM
Check and update the TRM database!
database
The TRM database is the only authoritative source about the status and place
of each TRM. In case you are removing, installing or shipping back some TRM
please update it!
CPDM
before 10/7: 2
- 10/7: 3
- Total: 5
- 1 in cosmic rays station
- 2 in supermodule 1
- 2 in electronics test room
- * Total:6*
- 1 delivered from caen
- 1 in cosmic rays station
- 2 in supermodule 1
- 3 in electronics test room
LTM
02/06/2006
- 1 on Cosmic setup, 1 ( not fully working ) at Bo for tests
07/07/2006 : 4 LTM delivered
- 6 LTM
- 1 on Cosmic rays station
- 1 at Bo for tests ( not fully working)
- 4 in electronics test room
15/07/2006 : 1 LTM Sent to CAEN for test
- 5 LTM
- 1 on Cosmic rays station
- 1 at Bo for tests
- 1 in supermodule 1
- 2 in electronics testroom
15/09/2006
- 7 LTM
- 1 on Cosmic setup
- 1 at Bo for test ( not fully working)
- 4 in SM 0
- 1 in SM 8
- expected other 3 LTMs to complete SM 8 on Monday
A1676
20/07/2006
- Total: 6
- 2 in SY1527
- 4 in electrnics testroom
SY1527
10/07/2006
15/11/2006
HV SY1527 and boards
Power Supplies and boards for the HV system