NP02/protoDUNE dual-phase Operations page
* 06/08/19 : about 6.3m:
* 08/08/19 : about 7m:
Page under construction, more material will be added in the incoming weeks
Run coordinator phone: 164721 (+41 75 411 4721)
NP02 Electronic Logbook (new link as from 30/01/20): link
In order to get the permission to connect you should first subscribe to the e-group: pddp-elog-messages
Mattermost (CERN alternative to Slack) channel for NP02 operation: link
NP02 Run Coordination:
Some general aspects on the NP02 Run Coordination organization can be found in this document at this
link
List of Run Coordinator slots:
- Week of 5 August 2019: D.Duchesneau
- Week of 12 August 2019: D.Autiero
- Week of 19 August 2019: D.Autiero
- Week of 26 August 2019 T. Lux
- Week of 2 September 2019 T. Lux
- Week of 9 September 2019 D. Duchesneau
- Week of 16 September 2019 D. Duchesneau (16-17), D. Autiero (18-20)
- Week of 23 September 2019 J. Dawson
- Week of 30 September 2019 E. Mazzucato
- Week of 7 October 2019 E. Mazzucato
- Week of 14 October 2019 I. Gil-Botella
- Week of 21 October 2019 D. Duchesneau (21-22), D. Autiero (23-25)
- Week of 28 October 2019 H. Carranza
- Week of 4 November 2019 E. Mazzucato
- Week of 11 November 2019 D.Duchesneau
- Week of 18 November 2019 D.Autiero
- Week of 25 November 2019 C. Cuesta
- Week of 2 December 2019 maintenance
- Week of 9 December 2019 A. Tonazzo
- Week of 16 December 2019 G. Eurin
- Week of 06 January 2020 D. Duchesneau
- Week of 13 January 2020 G. Eurin
- Week of 20 January 2020 H. Carranza (20-21) / D. Duchesneau (22-24)
- Week of 27 January 2020 No RC due to DUNE collaboration meeting
- Week of 03 February 2020 D. Duchesneau (5-6/02)
A brief
run plan of the first commissioning weeks (as known in the week of 22 July) is posted here:
- Week of 5 August: End of LAr filling, HV test, CRP calibrations and tests including grids. The originally foreseen regeneration of purification cartridge has been already done from 30/07 to 01/08.
- Week of 12 August: Pressure test on Monday afternoon, Start of LAr recirculation, commissioning of CRP automatic adjustment, commissioning of LEMs+grid, ramping up of cathode HV with joint PMTs running and noise measurements of charge readout
NP02 Daily Meetings:
Daily meeting 13/8/19
short_status_13Aug.pdf
Daily meeting 14/8/19
short_status_14Aug.pdf
Daily meeting 15/8/19
short_status_15Aug.pdf
Daily meeting 16/8/19
short_status_16Aug.pdf
For simplicity the slides of these first daily meeting and of all the following ones have been posted on the elog. The access to the slides will continue via the elog only.
NP02 DAQ:
Instructions for shifters to run the NP02 DAQ can be found in the document at this
link. Involvement of shifters will start gradually in beta testing during the commissioning week of 12 August
NP02 Slow Control:
This is a
link to the NP02 Slow Control page
The website is built using
AngularJS 1.6.1 and HTML/CSS/JavaScript/PHP/SQL stack.
Version control is done using
GitLab repo.
Detailed description and instructions are available there.
NP02 Elog:
This is a
link to the NP02 Elog
NP02 data and software:
This is a short introduction
software_howto_v2.pdf to data access and software
Accessing
ProtoDUNE DP data within dunetpc & some general larsoft info
protodunedp_data_dunetpc_v0.pdf
Accessing the information from the automatic online reconstruction
bench.pdf
Information on how to access the light readout data
ProtoDUNE_LightData_191119.pdf
NP02 PMT run status:
available in the elog (valid from 02/08/19); to be used for reference for purity monitor runs and LED state
https://pddpelog.web.cern.ch/elisa/display/129
--
GiovannaLehmannMiotto - 2019-07-22
- bench.pdf: Access to information from Online Processing
NP02 Information on LEMs:
Information accessible there:
https://twiki.cern.ch/twiki/bin/view/CENF/LemOperation