Welcome to the LBNF-Cryostats TWiki Home page

General

Warm Vessels

Design and Requirements

First design review (27th May)

CAD 3d model + drawings

Structural analysis

Procurement

Logistics

Installation procedure

Schedule

Resources/Agreements

Cold Vessel:

Design and Requirements

GTT technology

CAD 3 model + drawings

Procurement

Logistics

Installation procedure

Schedule

Resources/Agreements

Interfaces requirements/constraints:

-- NectarB - 2015-08-06

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r4 - 2015-09-11 - NectarB
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    CENF All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback