DSA2.4 Continuous Integration and Certification Testbeds
Status of the deliverable
The document is being reviewed inside SA2.
New versions are always attached to this page:
- EMI_DSA2.4_Integration_Testbeds_v0.1.doc
- First draft of deliverable DS2.4 circulated to SA2 list on 2010_07_28
- Revised version on 08052010, this version integrates feedbacks from Cristina Aiftimiei, Jozef Cernak, Tomasz Wolak. In particular:
- Added Executive Summary;
- Mentioned possible evolution to Jira as tracking system;
- Clarified root access for PT left to local sites policy;
- Clarified that only Production version products will be guarantied. RC versions on demand;
- Clarified integration comes after preliminary certification tests on charge of PTs.
- EMI_DSA2.4_Integration_Testbeds_v0.2.doc: 09/6/2010
- Added EMI Testbed twiki automatic updates notifications (Sec. 4.1.7).
- Added use case of debugging information accessibility for tester users (Sec. 4.1.4).
- Added the notification of new Release Candidate product versions to EMI Testbed team (Sec. 4.1.5).
- EMI_DSA2.4_Integration_Testbeds_v0.3.doc: EMI_DSA2.4_Integration_Testbeds_v0.3.doc
- Integrated feedbacks from Jozef Cernak on amendment procedure (Sec 1.5).
- Added reference on testing guidelines (Sec. 3.3.1)
- EMI_DSA2.4_Integration_Testbeds_v0.5.doc: EMI_DSA2.4_Integration_Testbeds_v0.5.doc
- Integrated feedbacks from Alberto A.
- Changed References
- Highlighted Open issues in the Executive Summary.
- Mentioned in sec. 5 the testing VO created in the EMI testbed.
- Added the possibility of direct support requests to SA2.6 through savannah.
- Added the plan to setup a shift infrastructure for incoming support requests (sec. 4.1.6)
- EMI_DSA2.4_Integration_Testbeds_v0.7.doc: EMI_DSA2.4_Integration_Testbeds_v0.7.doc
- Added some terms definition in terminology table.
- Added new section 4.1 to clarify about the usage of EMI Testbed and subset testbeds terms throughout the document.
- Added section reporting current implementation status of Testbed.
- Added EMI Testbed operation solutions and practice reference table.
- Changed Executive Summary.
Review tracking
- 23/09/10 - DSA24 sent to F. Giacomini, M. Riedel, B. Konya, PEB for review, deadline 29/09
- 28/09/10 - B. Konya review received
- 12/10/10 - Second reminder to reviewers sent
- 20/10/10 - M. Riedel sent review
- 11/11/10 - O. Keeble sent review
- All reviews received; updated deliverable expected 19/11
- 15/11/10 - Replies to O. Keeble received; waiting for feedback from Oliver
- 16/11/10 - v0.9 accepted by O. Keeble
- 17/11/10 - Update from B. Konya: Deliverable accepted by B. Konya (already communicated earlier)
- Pending JRA1 acceptance of revision
- 25/11/10 - D. Dongiovanni updated JRA1 review wiki page
- Pending JRA1 acceptance of revision; deadline 30/11
- 03/12/10 - M. Riedel accepted v0.9
- PO to create final version, upload in CDS and submit to the EC
- 15/12/2010 - Uploaded in CDS and submitted to the EC
Reviewers
*Please review *
EMI_DSA2.4_Integration_Testbeds_v1.2.doc: EMI_DSA2.4_Integration_Testbeds_v1.2.doc