See also Official ATF Schedule

Run Schedule - version 0

Please comment/adjust

February 2008
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
          01 02
03 04
Mover commissioning at RAL
05
Mover commissioning at RAL
06
Mover commissioning at RAL
07
Mover commissioning at RAL
08
Mover commissioning at RAL
09
Travel to KEK
10
Travel to KEK
11
Vacation (National Founding Day)
12
Installation
Luis travels to KEK
13
Installation
Luis arrives
Measure surface of sample foils with interferometer at KEK prior to installation
14
Installation
Mark arrives
15
Installation
16
James arrives
17 18
testing readout of beamline instrumentation
19
testing readout of beamline instrumentation
20
testing readout of beamline instrumentation
Nige arrives
21
Two shifts
22
Half shift, 1300-1700. Sample #1 removed and sample #2 inserted after shift ends. Pump down over weekend.
23
24 25 26
Measure sample # 1 with Keyence VK8510 interferometer (c/o Watanabe-san in Mech. Workshop)
Day shift: sample #2 study
27
a.m.: George and Nige leave
28
Day shift: requested time *iff no other group needs it
29
Day shift: sample #2 continues. After 1700, Dismount from beamline, radiation test equipment. If cool, then pack for shipping, remove from beam hall, otherwise leave in hall for activity retesting on 3 Mar.
 

March 2008
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
            01
Mark leaves
02
James leaves
03
Possibly request measurement of sample # 2. Luis to pack any remaining equipment if cool
04
Luis leaves
05 06 07 08
09 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          

April 2008
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
    01
Terenuma-san arranges for shipping of hardware back to RAL (in next Japanese FY)
02 03 04 05
06 07 08 09 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30      

  • 29 Jan 2008 - Measure surface of foils at RAL?
  • 4 Feb 2008 - 8 Feb 2008 - Mover commissioning at RAL
  • 9 Feb 2008 - 10 Feb 2008 - Travel to KEK
  • 11 Feb 2008 - Vacation (National Founding Day)
  • 12 Feb 2008 - 15 Feb 2008 - Installation
  • 12 Feb 2008 - Luis travels to KEK
  • 13 Feb 2008 - Luis arrives
  • 13 Feb 2008 - Measure surface of sample foils with interferometer at KEK prior to installation
  • 14 Feb 2008 - Mark arrives
  • 16 Feb 2008 - James arrives
  • 18 Feb 2008 - 20 Feb 2008 - testing readout of beamline instrumentation
  • 20 Feb 2008 - Nige arrives
  • 21 Feb 2008 - Two shifts
  • 22 Feb 2008 - Half shift, 1300-1700. Sample #1 removed and sample #2 inserted after shift ends. Pump down over weekend.
  • 26 Feb 2008 - Measure sample # 1 with Keyence VK8510 interferometer (c/o Watanabe-san in Mech. Workshop)
  • 26 Feb 2008 - Day shift: sample #2 study
  • 27 Feb 2008 - a.m.: George and Nige leave
  • 28 Feb 2008 - Day shift: requested time *iff no other group needs it
  • 29 Feb 2008 - Day shift: sample #2 continues. After 1700, Dismount from beamline, radiation test equipment. If cool, then pack for shipping, remove from beam hall, otherwise leave in hall for activity retesting on 3 Mar.
  • 01 Mar 2008 - Mark leaves
  • 02 Mar 2008 - James leaves
  • 03 Mar 2008 - Possibly request measurement of sample # 2. Luis to pack any remaining equipment if cool
  • 04 Mar 2008 - Luis leaves
  • 01 Apr 2008 - Terenuma-san arranges for shipping of hardware back to RAL (in next Japanese FY)

-- NigelWatson - 10 Jan 2008

Edit | Attach | Watch | Print version | History: r11 < r10 < r9 < r8 < r7 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r11 - 2008-02-26 - NigelWatson
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    ILCBDSColl All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback