Technical Design Reports | ||||
CMS-PAS-TDR-21-002 | The Phase-2 Upgrade of the CMS Beam Radiation Instrumentation and Luminosity Detectors | March 2021 | ||
CMS-PAS-TDR-21-001 | The Phase-2 Upgrade of the CMS Data Acquisition and High Level Trigger | March 2021 | ||
CMS-PAS-TDR-20-001 | The Phase-2 Upgrade of the CMS Level-1 Trigger | April 2020 | ||
CMS-PAS-TDR-19-002 | A MIP Timing Detector for the CMS Phase-2 Upgrade | March 2019 | ||
CMS-PAS-TDR-17-007 | The Phase-2 Upgrade of the CMS Endcap Calorimeter | November 2017 | ||
CMS-PAS-TDR-17-005 | The Phase-2 Upgrade of the CMS DAQ Interim Technical Design Report | November 2017 | ||
CMS-PAS-TDR-17-004 | The Phase-2 Upgrade of the CMS L1 Trigger Interim Technical Design Report | September 2017 | ||
CMS-PAS-TDR-17-003 | The Phase-2 Upgrade of the CMS Muon Detectors | November 2017 | ||
CMS-PAS-TDR-17-002 | The Phase-2 Upgrade of the CMS Barrel Calorimeters | September 2017 | ||
CMS-PAS-TDR-17-001 | The Phase-2 Upgrade of the CMS Tracker | November 2017 | ||
CMS-PAS-TDR-15-002 | Technical proposal for the Phase-II Upgrade of the Compact Muon Solenoid | 1 June 2015 |
Compact Muon Solenoid LHC, CERN |