B513 Planning Meeting, 9th February 2001

Present:          Tony Cass, Anne Funken, Jukka Lindroos, Dave Underhill

1.             Preamble

2.             Bellwater Report Review

3.             Mezzanine floor costs

4.             Air Conditioning

·         We may need to avoid overhead ducting for air conditioning if the vault solution is to be viable. Is a solution with “room air conditioning units” feasible? Jukka will investigate. The concerns are that there may be “hotspots” in the middle of the room from which the units can’t suck warm air—but perhaps this can be avoided by placing one or more units in the middle of the room. Setting 25°C rather than 22°C as the working temperature might be beneficial. If this solution is feasible then the recently cleared MG room would not be needed to house air-conditioning plant.

5.             Electricity Supply for B513

6.             AOB