B513 Planning Meeting, 5th April 2001

Present:           Tony Cass, Anne Funken, Jukka Lindroos, Dave Underhill, Mario Vergari

1.             Access control for B31 and B513

2.             Mezzanine costings

3.             Vault air-conditioning

·         With this solution, the corridor air conditioning in B513 can remain integrated with the machine room air conditioning provided the machine room heat load stays below 1.5MW.

4.             HV supply for B513

5.             LV supply for B513

6.             AOB