B513 Meeting, 26th June 2001

1.             Vault air conditioning

2.             LV distribution in the vault

3.             HV supply for B513

a.       Anne confirmed that all unrelated equipment (network cabling, …) must be removed from the 18kV cell area and that the 2MVA transformer should be “close” to low voltage switchboard—distances are normally of the order 10-15m.

b.      Excavation down below the existing basement level (to provide adequate clearance for cables) is not ruled out. However, fresh air supply ducting would have to be rerouted and there would be constraints due to the piles supporting the building.

c.       A rooftop location for the transformers would present difficulties for maintenance. Further, the building might need reinforcing as it is unlikely the roof could support even one or two 6tonne transformers.