Creation of a new building for Data Storage

Picture Record

29th January 2001
The site before construction starts.

20010129_1.jpg (77590 bytes)20010129_2.jpg (71797 bytes)

5th March
The site marked out... Work starts on the inside of B186 in preparation for removal of the metal cladding.
20010305_1.jpg (47798 bytes)20010305_2.jpg (41675 bytes)
23rd March
Starting excavation for the foundations and false floor.
20010323_1.jpg (158595 bytes)20010323_2.jpg (161290 bytes)
26th March
Removing the spoil.
20010326_2.jpg (148784 bytes)20010326_4.jpg (144080 bytes)
28th March
Going deeper!
20010328_1.jpg (72030 bytes)20010328_2.jpg (59298 bytes)
29th March
The metal cladding by the green door is to be replaced by a continuation of the concrete wall. These pictures (especially the one on the left) show the deeper excavations to support the foundations for this wall.
20010329_1.jpg (159688 bytes)20010329_2.jpg (174840 bytes)
6th April
Pouring concrete to support the new B186 wall.
20010406_1.jpg (177808 bytes)
11th April
The wall foundations (and improved security!) in place.
20010411_2.jpg (176906 bytes)20010411_3.jpg (166566 bytes)
17th April
The base of B613 takes shape.
20010417_1.jpg (171388 bytes)20010417_2.jpg (169314 bytes)
19th April
A base for B613 is in place. The steel reinforcements at front left are for the wall isolating the air conditioning equipment from the silo area.
20010419_1.jpg (174500 bytes)20010419_2.jpg (171023 bytes)
24th April
Installing reinforcements for the foundations and walls.
20010424_1.jpg (173374 bytes)20010424_2.jpg (171883 bytes)
26th April
The reinforcements advance and shuttering for the concrete is in place for some walls.
20010426_1.jpg (179675 bytes)20010426_2.jpg (184847 bytes)
27th April
Pouring concrete for the foundations.
20010427_1.jpg (168169 bytes)20010427_2.jpg (165250 bytes)
3rd May
The first wall in place and installing shuttering for the second.
20010504_1.jpg (179377 bytes)20010504_2.jpg (162918 bytes)
11th May
Removing the B186 cladding with wall bases mostly in place
20010511_1.jpg (170013 bytes)20010511_2.jpg (175487 bytes)
16th May
B613 wall bases in place and work well advanced on the new concrete wall for B186.
I believe the objects that can be seen inside B186 on the right hand photograph are part of the CMS electromagnetic calorimeter.
20010516_1.jpg (173142 bytes)20010516_2.jpg (170669 bytes)
30th May
All the concrete in place ready for the wall and roof supports.
20010530_1.jpg (168482 bytes)20010530_2.jpg (182392 bytes)
6th June
Installing the wall and roof supports.
20010606_1.jpg (170824 bytes)20010606_2.jpg (163722 bytes)
11th June
All wall and roof supports installed.
20010611_1.jpg (177698 bytes)20010611_2.jpg (167746 bytes)
2nd July
With a roof... but after a heavy thunderstorm!
20010702_1.jpg (166751 bytes)20010702_2.jpg (162699 bytes)
5th July
Digging the caniveau for cables.
20010705_1.jpg (173062 bytes)20010705_2.jpg (169451 bytes)
11th July
Installing the concrete sides for the caniveau.
20010711_1.jpg (176866 bytes)20010711_2.jpg (175959 bytes)
22nd August
The completed caniveau with the cable trays in place.
20010822_1.jpg (187750 bytes)
22nd August
Interior views before installation of the false floor.
20010822_2.jpg (160252 bytes)20010822_3.jpg (163510 bytes)
17th September
View of the interior with the false floor in place and of the air conditioning plant.
20010917_1.jpg (161325 bytes)20010917_2.jpg (150999 bytes)
28th September
The main room all ready for the robots to arrive.

Some interesting electrical cabinets (not!).

20010928_1.jpg (145018 bytes)20010928_2.jpg (163391 bytes)
2nd October
New STK silos delivered to B613.
20011002_1.jpg (146510 bytes)20011002_2.jpg (158206 bytes)
4th October
Installing the new STK silos.
20011004_2.jpg (153038 bytes)20011004_3.jpg (155953 bytes)
4th October
Installing racks for IT equipment.
20011004_1.jpg (160033 bytes)
23rd November
The completed and labelled building, with some "before" pictures for comparison.
20011123_2.jpg (158323 bytes)20010129_2.jpg (71797 bytes)
20011123_1.jpg (165681 bytes)20010129_1.jpg (77590 bytes)

14th December
The end of the project is marked by an article in the Weekly Bulletin:
http://weblib.cern.ch/format/showfull?uid=3081544_27756&base=ADMBUL&sysnb=0021648

Bulletin Photo 1.JPG (288219 bytes)Bulletin Photo 2.JPG (593188 bytes)Bulletin Photo 3.JPG (606465 bytes)
 