11 March 2009 – GDB MeetingAgenda

CREAM CE Presentations – Several presentations covered the status of the development, testing, performance and deployment of the CREAM CE. And ALICE presented their initial experience using the CREAM CE.

Multi-node Pilot Jobs Presentations - Several presentations covered the status of the development, testing, performance and deployment of the SCAS system. ATLAS and CMS presented their initial experience using Multi-node Pilot Jobs.

Installed Capacity Reports – S.Traylen presented the activity of publishing information in order to provide the WLCG management with a view of the total installed capacity and resource usage by VOs at sites.

In addition there were updates on Porting WN to SL5 64 Bits and Middleware status and progress.

11 February 2009 – GDB MeetingAgenda

February’s GDB Meeting focused on Mass Storage Performance, File Caching on the WNs, the EGEE AUTHz Framework, VDT/OSG Status and Job Wrapper Tests.

WLCG-OSG-EGEE Operations (OPS)
Agendas - Minutes - Action List

6 April 2009 Minutes

RSS Feed for Downtime Modifications - ATLAS requested for the RSS feed to be updated if a downtime is modified, and the modification itself logged. GLite releases are on schedule. There are now reference cards for gLite services.

30 March 2009 Minutes

Smaller Cache in New BDII - The new BDII, smaller cache at start up time. 50mb instead of 1GB.

Update 43 and 44 Changed – The contents are changed: Cream now in release 44. Expected to be release around Easter. Update 43 adds a new YAIM clients in particular service publishing. 6th April expected release date

23 March 2009 Minutes

SL5 WN Released - Scientific Linux 5 Worker Node released to Production as gLite 3.2, update 01.

16 March 2009 Minutes

gLite 3.1 Update 42 - gLite 3.1 Update 42 (scheduled for 23-MAR-2009) will include VDT 1.6.1 Release 9 which fixes a Globus bug that affects most m/w services.

GLite 3.2. Release - gLite 3.2 Update 01 (scheduled for 30-MAR-2009) will include new SL5 WNs

WMS Problems Reported by LHCb - LHCb reported being affected by WMS problems

9 March 2009 Minutes

Signed RPMs for gLite - gLite3.2 is announced as the first version of gLite supporting signed RPMs. 

Tests of LHCb Tier-1 Sites - LHCb is doing extensive testing of GGUS alarm tickets against T1 sites.

2 March 2009 Minutes

EGEE User Forum – The EGEE User Forum took place this week in Geneva.  Link

23 February 2009 Minutes

SL5 64 Bits Worker Node - SL5 64 bit worker node has been running at CERN for some time without problems. This will be packaged and released as soon as possible.

32 bit versions of SL5 services will only be worked on upon request and if there is sufficient effort. The preference is for the SL5 version of the middleware to be 64 bit only.

BNL and FNAL Move to OSG - With BNL and FNAL completing their move out of the EGEE infrastructure and into the OSG infrastructure, a meeting has been set up to finalize the details of how trouble tickets will be dealt with.

 

General News and Main Events
LCG Meetings - Calendar

8 April 2009

Grid Deployment Board (GDB) - CERN Agenda 

13 May 2009

Grid Deployment Board (GDB) - CERN Agenda

10 June 2009

Grid Deployment Board (GDB) – CERN Agenda

9-10 July 2009

WLCG STEP'09 Post-Mortem Workshop - CERN. Agenda

8 September 2009

Grid Deployment Board (GDB) - CERN. GDB Agenda

 

Management Board (MB)
Web - Wiki - Members - Agendas - Minutes

7 April 2009 – Agenda, Minutes

Experiments Requirements for 2009/10– The MB discussed the requirements distributed by the Experiments the previous week. I.Bird summarized what will be reported to the upcoming RRB meeting.

LCG Operations Report – J.Shiers presented a summary of status and progress of the LCG Operations. The daily meetings summaries are available :Link

ATLAS 2009Q1 QR Report – D.Barberis presented the 2009Q1 quarterly report for the ATLAS software and services. And their planes for 2009.

Users Analysis Support - M.Lamanna reported on the progress in Support for User Analysis in IT/GS, and as a follow up of the analysis support session at the WLCG Workshop.

31 March 2009 – Agenda, Minutes

Experiments Requirements for 2009//10 - The whole MB meeting was dedicated to the presentation and the discussion of the computing requirements of the four LHC Experiments.

LCG Operations Report – J.Shiers presented a summary of status and progress of the LCG Operations. The daily meetings summaries are available :Link

17 March 2009 – Agenda, Minutes

User Info in Accounting - J.Gordon presented the proposal about collecting user information in the accounting database.

Priorities for the User Analysis WG - M.Schulz presented the email he sent before the meeting to the Working Group members.

GDB Summary - J.Gordon presented a summary of the March’s GDB Meeting. Link

10 March 2009 – Agenda, Minutes

LCG Operations Report – J.Shiers presented a summary of status and progress of the LCG Operations. The daily meetings summaries are available :Link

R&D Projects in the Application Area - P.Mato presented the two R&D project under development in the Applications Area. “Parallelization of software frameworks to exploit multi-core processors” and “Portable analysis environment using virtualization technology”.

24 February 2009 – Agenda, Minutes

Feedback from LHCC Review and Overview Board – I.Bird presented a summary of the results of the LHCC Review and OB Meetings.

Reporting OSG Installed Capacity - R.Pordes reported the plans of OSG, US ATLAS and US CMS on reporting the installed capacity at the OSG Sites. The goal is to report installed capacity and information about the usage of such resources.

17 February 2009 – Agenda, Minutes

LCG Operations Report – J.Shiers presented a summary of status and progress of the LCG Operations. The daily meetings summaries are available :Link

User Analysis WG - M.Schulz presented the summary of the feedback received about the expectation of the Experiment for their User Analysis at CERN.

Architects Forum (AF)
Minutes - Web

2 April 2009 - Minutes

Migration from CVS to SVN - Discussion on the CVS to SVN migration of experiments code repositories. Changes in the priorities and plans from the experiments due to the new LHC schedule.

SLC5 Migration Issues - CERNLIB libraries has been re-compiled and tested by ATLAS. New failures of the FIO provided SLC55 lxbuild nodes for the nightly build service(s). Slow responsiveness. Released new version of gLite for SLC5 (64 bit)

Virtualization Workshop - A lot of interest and nice feedback for both multi-core and virtualization R&D activities at CHEP. Starting to prepare the workshop on adapting applications and computing services to multi-core and virtualization.

19 March 2009 - Minutes

Geant4 Patch Released - A new Geant4 patch for 9.2 was released last Monday. CMS was waiting for it. Both ATLAS and CMS are now aligned to the same version of Geant4.

SLC5 Migration Issues - One of the biggest problems for the SLC5 migration is being the slow acquisition and correct configuration of the lxbuild nodes. The CERNLIB libraries need to be re-compiled with -fPIC to avoid the problem with SELinux detected by ATLAS.

Experiment SLC5 Migration Status - CMS is prioritizing on the 64 bit version first. LHCb is running SLC5 native code on the nightly builds. ATLAS is also currently integrating on the nightly builds. ALICE already migrated.

5 March 2009 - Minutes

ROOT 5.23/002 Released - The ROOT development release 5.23/02 was announced. ALICE is already running on it in production. LHCb and ATLAS are currently testing directly the head revision. A new ROOT web page based on the Drupal content management system is in place.

Move to SL5 - Additional SLC5 issues such as the cron/cvs patch, the Oracle client fix, CERNLIB problem were discussed.

ATLAS Move to Geant4 9.2 - ATLAS decided to upgrade the simulation to Geant4 9.2. The production releases for ATLAS and CMS have been delayed for 2 and 4 weeks respectively. 

19 February 2009 - Minutes

Migration to SL5 - Reviewed the list of pending issues related to the migration to SLC5.  The migration of the majority of the CERN resources to SLC5 at the time scale of April is probably fine. The lxplus alias could be changed sometime between April and September (before the experiments startup). Every experiment is interested on a transition to SLC5/64bit of the Grid resources as soon and as short as possible.

LCG_56 Released - LCG_56 configuration was released last Friday. ATLAS has already taken it and there are no problems so far.