Research & Development
|
B0 Prototype: R&D and Assembly at CEA - Centre de Saclay
B0 Prototype: Coil Production and Test
|
Design
|
|
Toroid Design
|
|
|
BT Design
|
|
|
|
|
Conductor & Winding
|
single strand
|
40 strands cable
|
aluminium extruded conductor
|
opened conductor
|
coil winding
(double pancake)
|
Coil Casing & Vacuum Vessel
|
|
coil casing
production
|
|
|
vacuum vessel
production
|
|
Cold Mass Integration (Integration 1)
|
|
filling bladders
|
|
|
turn-over
|
|
|
Integration Area Overview
|
|
Cryostat Integration (Integration 2)
|
|
Cooling Lines
|
|
|
Tie Rod
|
|
|
Conductor Bending
|
|
|
Integration Area Overview
10 September 2003
|
|
|
Thermal Shield Assembly
|
|
|
Thermal Shield Completed
|
|
|
Thermal Shield Cooling Lines
|
|
|
Thermal Shield Cooling Lines
|
|
|
Thermal Shield Cooling Lines
|
|
|
Multilayer Superinsulation
|
|
|
Insertion into Cryostat
1 April 2004
|
|
|
Insertion into Cryostat
|
|
|
Cryostat Welding
|
|
|
Finished Assembly
|
|
|
Integration Area Overview
16 February 2005
|
|
On-surface Test Station (Building 180)
|
|
Test Station Layout
|
|
|
Coil under test
August 2004
|
|
|
Test Station with Coil
September 2004
|
|
|
B1 at 22 kA
|
|
Underground Installation
|
|
View of cavern with feet
25-Feb-2004
|
|
|
Descent of the first coil
26-Oct-2004
|
|
|
Positioning of the first coil
03-Nov-2004
|
|
|
View of cavern with 2 coils
10-Dec-2004
|
|
|
View of cavern with 4 coils
11-May-2005
|
|
|
View of cavern with 6 coils
18-Jul-2005
|
|
|
View of cavern with 8 coils
23-Sep-2005
|
|
|
Barrel Toroid Completed
04-Nov-2005
|
|
Commissioning
|
|
Reached 21 kA
Fast Dump at 20.5 kA
09/10-Nov-2006
|
|
|
The Test Team
10-Nov-2006
|
|
|
The Champagne
10-Nov-2006
|
|