* General
Overview
Publicity
Contact
* Technical
Design
Documents
Instrumentation
Paper Archive
* Publications
Papers
Posters
Presentations
* Gallery
Illustrations
Photos
Video
* Status
Integration
Operation
Data Archive
Webcams
* Search
Site Search

Illustrations

Research & Development
B0 Prototype: R&D and Assembly at CEA - Centre de Saclay
B0 Prototype: Coil Production and Test
Design

Toroid Design

BT Design

Cold Mass
(JPG, Gif, AI)

Cross Section (B&W)
(JPG, Gif, AI)

Coil Cross Section
Colour: JPG, Gif, AI
B&W: JPG, Gif, AI
Conductor & Winding

single strand

40 strands cable

aluminium extruded conductor

opened conductor

coil winding
(double pancake)
Coil Casing & Vacuum Vessel
coil casing
production
vacuum vessel
production
Cold Mass Integration (Integration 1)
filling bladders
turn-over
Integration Area Overview
Cryostat Integration (Integration 2)
Cooling Lines
Tie Rod
Conductor Bending
Integration Area Overview
10 September 2003
Thermal Shield Assembly
Thermal Shield Completed
Thermal Shield Cooling Lines
Thermal Shield Cooling Lines
Thermal Shield Cooling Lines
Multilayer Superinsulation
Insertion into Cryostat
1 April 2004
Insertion into Cryostat
Cryostat Welding
Finished Assembly
Integration Area Overview
16 February 2005
On-surface Test Station (Building 180)
Test Station Layout
Coil under test
August 2004
Test Station with Coil
September 2004
B1 at 22 kA
Underground Installation
View of cavern with feet
25-Feb-2004
Descent of the first coil
26-Oct-2004
Positioning of the first coil
03-Nov-2004
View of cavern with 2 coils
10-Dec-2004
View of cavern with 4 coils
11-May-2005
View of cavern with 6 coils
18-Jul-2005
View of cavern with 8 coils
23-Sep-2005
Barrel Toroid Completed
04-Nov-2005
Commissioning
Reached 21 kA
Fast Dump at 20.5 kA
09/10-Nov-2006
The Test Team
10-Nov-2006
The Champagne
10-Nov-2006

ATLAS Magnet Group / Roger Ruber (2002-2007).
ATLAS | CERN