* General
Overview
Publicity
Contact
* Technical
Design
Documents
Instrumentation
Paper Archive
* Publications
Papers
Posters
Presentations
* Gallery
Illustrations
Photos
Video
* Status
Operation
Data Archive
Webcams
* Search
Site Search

Photos

Date Subject Photographer
* General Photos on ATLAS and its Magnet System
* RAL Photo Gallery
* NIKHEF Photo Gallery
2007
12-Jul-2007 Lowering of the 2nd ECT Maximiliem Brice
11-Jul-2007 Preparation for the lowering of the 2nd ECT Christina, Aurelien Mulle, Maximiliem Brice
28-Jun-2007 Transport of the 2nd ECT Serge Pelletier, Sylvie Prodon
13-Jun-2007 ATLAS ECT-A lowering into UX15 (3/3) Serge Pelletier, Sylvie Prodon
13-Jun-2007 ATLAS ECT-A lowering into UX15 (2/3) Rudiger Voss
13-Jun-2007 ATLAS ECT-A lowering into UX15 (1/3) Claudia Marcelloni, Maximilien Brice
13-Jun-2007 ATLAS ECT-A lowering from SX1 Claudia Marcelloni
13-Jun-2007 ECT-A Reprise at Point 1 Philippe Benoit
12-Jun-2007 ATLAS ECT-A movement inside SX1 Claudia Marcelloni
29-May-2007 ATLAS ECT-A transport between bldg. 180 and Point 1 (2/2) Claudia Marcelloni
29-May-2007 ATLAS ECT-A transport between bldg. 180 and Point 1 (1/2) Sylvie Prodon
18-Apr-2007 Overwiew of the working in progress for ATLAS during April 2007 on CERN Building 119 Claudia Marcelloni
06-Feb-2007 ECT-A Transport to the Test Station (3/3) Claudia Marcelloni
06-Feb-2007 ECT-A Transport to the Test Station (2/3) Sylvie Prodon
06-Feb-2007 ECT-A Transport to the Test Station (1/3) Michael Jeckel
05-Feb-2007 ECT-A Beginning Transport to the Test Station Claudia Marcelloni
05-Feb-2007 ECT-A Leaving Building 191 Michael Jeckel
Jan-2007 ECT-A Preparation for Transport Philippe Benoit
2006
13-Nov-2006 Cold Mass and Integration Team at Bat.191 Claudia Marcelloni
27-Sep-2006 Transport of 1/2 End-Caps from building 180 to 191 Sylvie Prodon
Jul-2006 Vacuum Vessel A Thermal Shield Installation
09-Jun-2006 Vacuum Vessel A Shell Movement over Cold Mass A
18-May-2006 Cold Mass A & C Integration
03-Mar-2006 Preparation of the End-Caps in Bat.191 Maximilien Brice
03-Mar-2006 Integration work in Bat.180 (ECT & Muon) Maximilien Brice
10-Apr-2006 Cold Mass A Load Transfered
Apr-2006 Vacuum Vessel A Opening
Mar-2006 Cold Mass C Integration Top Halve
Mar-2006 Cold Mass C Integration Bottom Halve
Mar-2006 Cold Mass A Instrumentation and 6K Shield
24-Feb-2006 Cold Mass C Integration 2nd Sub-module
23-Feb-2006 Cold Mass A Quench Protection Heater Installation
22-Feb-2006 Cold Mass C Sub-module Assembly
22-Feb-2006 Cold Mass A Instrumentation and Manifolds
02-Feb-2006 Cold Mass A Assembly
2005
02-Nov-2005 End-Cap Toroid Cold Mass Assembly C. Marcelloni Oliveira
25-Oct-2005 View of the End-Caps in Bat.191 Maximilien Brice
Oct-2005 Cold Mass A Assembly
Sep-2005 Cold Mass A Sub-module Transport
12-Sep-2005 Moving Vacuum Vessel A onto the Cantilever
09-Sep-2005 Moving Vacuum Vessel C
09-Sep-2005 Cold Mass A Sub-module Assembly
2003
10-Nov-2003 Work in Bat.191 CERN Photo Archive
08-Apr-2003 Turnover of Vacuum Vessel CERN Photo Archive
17-Mar-2003 Vacuum Vessel Interior CERN Photo Archive
2002
03-May-2002 ECT Integration Area in Bat. 191 CERN Photo Archive
26-Apr-2002 Vacuum Vessel in Bat. 191 CERN Photo Archive
26-Apr-2002 Vacuum Vessel Transport to CERN CERN Photo Archive
26-Apr-2002 Vacuum Vessel Lifting over Ski Bridge in Les Rousses CERN Photo Archive
23-Apr-2002 Vacuum Vessel Lifting over Ski Bridge in Les Rousses
16-Apr-2002 Vacuum Vessel Handling in Bat.191 Sylvie Prodon
2001
14-Nov-2001 Vacuum Vessel Components CERN Photo Archive
15-Mar-2001 ECT Integration Area CERN Photo Archive
Visits
02-Apr-2003 Visit: Chairman FZ Karlsruhe CERN Photo Archive
12-Feb-2003 Dutch Supplier Rewarded for the Manufacture of the Vacuum Vessels CERN Photo Archive
25-Oct-2002 Visit: Russian Minister for Science and Technology CERN Photo Archive
24-Sep-2002 Visit: UK Department of Trade and Industry CERN Photo Archive
23-Sep-2002 Visit: USA National Science Foundation CERN Photo Archive

ATLAS Magnet Group / Roger Ruber (2002-2007).
ATLAS | CERN