Minutes of CLIC meetings
in 2005:

07-Jan-2005
Review of the ILC Workshop, KEK, Nov. 13-15,
with summaries of the working groups
D. Schulte, E. Chiaveri
14-Jan-2005 Coherent Synchrotron Radiation and Touschek Scattering in the CLIC Damping Ring
Beam Emittances and Damping Time Measurements at ATF Damping Ring
F. Zimmermann, M. Korostelev
04-Feb-2005
The Small Isochronous Ring project at Michigan State University,
Electrostatic Storage Devices at MPI-K
A. Rodriguez,
C. Welsch
11-Feb-2005 Report from the CLIC collaboration meeting G. Geschonke
18-Feb-2005 BINP Experience in Wiggler Development E. Levichev,  Budker Institute of Nuclear Physics (Novosibirsk)
25-Feb-2005 Summary of the MDI/ATF2 workshop at SLAC A. De Roeck
04-Mar-2005
Decision CELP Speech Coding using Squared and Perceptual Error R. Fandos
11-Mar-2005 Summary of the WIGGLE 2005 workshop at Frascati M. Korostelev, D. Schulte, F. Zimmermann, H. Braun
08-Apr-2005
Review of CLIC activities 2004 I. Wilson
12-Apr-2005 special CLIC parameter meeting
all
03-May-2005
ILC Beam Delivery and ATF2 A. Seryi  / SLAC
09-May-2005 Evacuation of SR power from CLIC damping ring
Dynamic Aperture of the CLIC Damping Ring

K. Zolotarev / BINP
P. Piminov / BINP
27-May-2005 Emittance Reduction using Variable Field Dipoles in Electron Storage Rings Y. Papaphilippou, ESRF Grenoble
03-Jun-2005
Precision  Phase Measurement and Feedback for CLIC D. Schulte, J. Sladen
10-Jun-2005 Recent Investigations of TS-MME for the CLIC Project G. Arnau Izquierdo, P. Costa Pinto, S. Pérouse de Montclos, T. Ramsvik, S. Sgobba
17-Jun-2005 Luminosity Tuning Bumps in the CLIC Main Linac P. Eliasson, D. Schulte
24-Jun-2005 Pressure Distribution Calculations for CLIC Accelerating Structures
Report from RF'05 workshop, Kalamata, June 13-17

P. Costa Pinto, E. Jensen, A. Grudiev
08-Jul-2005 CLIC PETS up-to-date status I. Syratchev
02-Sep-2005
Review of ILC-Snowmass workshop J-P. Delahaye, D. Schulte, L. Tavian, H. Braun, V. Parma, J. Gillies, J-L. Baldy
16-Sep-2005 Progress with Damping Ring Wiggler Design
CLIC Accelerating Structure Testing at SLAC

E. Levitchev, P. Vobly; S. Döbert, A. Rodriguez, W. Wuensch
21-Sep-2005 CLIC parameter meeting F. Tecker, W. Wuensch
23-Sep-2005 Stabilization Studies at LAPP / Annecy B. Bolzon, N. Geffroy
07-Oct-2005 Status of GdfidL W. Bruns
28-Oct-2005 Photo Injectors G. Suberlucq
08-Nov-2005
CLIC parameter meeting
W. Wuensch, D. Schulte, A. Grudiev
18-Nov-2005 Highlights from Nanobeam'05 F. Zimmermann
28-Nov-2005 Status and Plans of the US-Multi TeV Linear Collider Collaboration
Status and Plans for Active High Power RF Switching

R. Ruth / SLAC, S. Tantawi / SLAC
02-Dec-2005
30 GHz rf components for CTF3 A. Grudiev, I. Syratchev
09-Dec-2005 Plans for EUROTeV Beam Instrumentation R&D
L. Soby
16-Dec-2005 CLIC Polarized Positron Source Based on Laser Compton Scattering
F. Zimmermann



Back to the CLIC meeting Home page

Frank Tecker  - Last updated  19-12-2005