07-Jan-2005
|
Review of
the ILC Workshop, KEK,
Nov. 13-15,
with summaries of the working groups |
D.
Schulte, E. Chiaveri |
14-Jan-2005 |
Coherent
Synchrotron Radiation and Touschek Scattering in the CLIC Damping Ring
Beam Emittances and Damping Time Measurements at ATF Damping Ring |
F. Zimmermann,
M. Korostelev |
04-Feb-2005
|
The Small
Isochronous Ring project at Michigan State University,
Electrostatic Storage Devices at MPI-K |
A. Rodriguez,
C. Welsch |
11-Feb-2005 |
Report from the CLIC collaboration
meeting |
G. Geschonke |
18-Feb-2005 |
BINP Experience
in Wiggler Development |
E.
Levichev, Budker Institute of Nuclear Physics
(Novosibirsk) |
25-Feb-2005 |
Summary of the MDI/ATF2 workshop
at SLAC |
A. De Roeck |
04-Mar-2005
|
Decision CELP Speech Coding using Squared and
Perceptual Error |
R. Fandos |
11-Mar-2005 |
Summary
of the WIGGLE 2005 workshop at Frascati |
M. Korostelev,
D. Schulte,
F. Zimmermann, H. Braun |
08-Apr-2005
|
Review of CLIC activities 2004 |
I. Wilson |
12-Apr-2005 |
special CLIC parameter meeting
|
all
|
03-May-2005
|
ILC Beam Delivery and ATF2 |
A. Seryi / SLAC |
09-May-2005 |
Evacuation of SR
power from CLIC damping ring
Dynamic
Aperture of the CLIC Damping Ring
|
K. Zolotarev /
BINP
P. Piminov / BINP |
27-May-2005 |
Emittance
Reduction
using Variable Field Dipoles in Electron Storage Rings |
Y. Papaphilippou,
ESRF Grenoble |
03-Jun-2005
|
Precision Phase Measurement
and Feedback for CLIC |
D. Schulte,
J. Sladen |
10-Jun-2005 |
Recent
Investigations
of TS-MME for the CLIC Project |
G. Arnau Izquierdo,
P. Costa Pinto, S. Pérouse de Montclos,
T. Ramsvik, S. Sgobba |
17-Jun-2005 |
Luminosity
Tuning Bumps in the CLIC Main Linac |
P. Eliasson,
D. Schulte |
24-Jun-2005 |
Pressure
Distribution
Calculations for CLIC Accelerating Structures
Report from
RF'05 workshop, Kalamata, June 13-17
|
P. Costa Pinto,
E. Jensen,
A. Grudiev |
08-Jul-2005 |
CLIC PETS
up-to-date status |
I. Syratchev |
02-Sep-2005
|
Review of
ILC-Snowmass workshop |
J-P. Delahaye,
D. Schulte,
L. Tavian, H. Braun, V. Parma, J. Gillies,
J-L. Baldy
|
16-Sep-2005 |
Progress
with Damping Ring Wiggler Design
CLIC Accelerating Structure Testing at SLAC
|
E. Levitchev,
P. Vobly;
S. Döbert,
A. Rodriguez, W. Wuensch |
21-Sep-2005 |
CLIC
parameter meeting |
F. Tecker, W. Wuensch |
23-Sep-2005 |
Stabilization
Studies at
LAPP / Annecy |
B. Bolzon, N. Geffroy |
07-Oct-2005 |
Status of
GdfidL |
W. Bruns |
28-Oct-2005 |
Photo Injectors |
G.
Suberlucq |
08-Nov-2005
|
CLIC
parameter meeting
|
W. Wuensch,
D. Schulte, A. Grudiev |
18-Nov-2005 |
Highlights from Nanobeam'05 |
F. Zimmermann |
28-Nov-2005 |
Status
and Plans of the
US-Multi TeV Linear
Collider Collaboration
Status and
Plans for Active High Power RF Switching
|
R. Ruth / SLAC,
S. Tantawi / SLAC |
02-Dec-2005
|
30 GHz rf
components for CTF3 |
A.
Grudiev, I. Syratchev |
09-Dec-2005 |
Plans for EUROTeV Beam Instrumentation R&D
|
L. Soby
|
16-Dec-2005 |
CLIC
Polarized Positron Source Based on Laser Compton Scattering
|
F. Zimmermann
|