LCG Grid Deployment - CERN ROC

Cern ROC Work Log


ROC CERN (C5 Report on 23-July-09)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* OSG T1 site: BNL-LCG2 was requested to take some action about availability of their services in GridView. Currently its zero.
Detail in GGUS ticket:  https://gus.fzk.de/ws/ticket_info.php?ticket=50463&from=search

* Sites running an old version of software on WNs (SL4) were requested to  upgrade their services (to latest version  in Production).



ROC CERN (C5 Report on 16-July-09)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* New site: ICN-UNAM (Instituto de Ciencias Nucleares) in Mexico certified and started in production.

* BNL-LCG2 site is now publishing through OSG/WLCG (under an OSG site given the same name "BNL-LCG2"). Site would like to de-list the EGEE site (under discussion).

* Two sites TIER-2 are under certification process:
Site : SCA-SCINET-T2 (Net High Performance Computing Consortium) Canada.
Site: Wuhan-Tier-2 ( WUHAN-CCNU-LCG2)  ,China.



ROC CERN (C5 Report on 12-Feb-09)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* The site SDU-LCG2 was suspended because not responsive to tickets

* There are currently (12-Feb-09) 4 open GGUS tickets assigned to CERN-PROD 
the eldest lof which was opened on the 8th of January * GGUS:45090 - 08.01.2009 - CT0000000573170 * GGUS:45841 - 04.02.2009 - CT0000000579274 * GGUS:46020 - 06.02.2009 - CT0000000579864 * GGUS:46094 - 20.02.2009 - CT0000000580723


ROC CERN (C5 Report on 5-Jun-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* Certification of 
   "Universidad de los Andes"
    Bogota - Colombia
    in progress

* Re-Certification of 
   BEIJING-CNIC-LCG2-IA64
   Beijing - China
   Problems with SAMAP are slowing down the work

* Work in progress with FIO to define/improve 
   grid-related emergency procedures
   (e.g. power cuts)

* Business as usual with tickets


ROC CERN (C5 Report on 22-May-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* Certification of 
   "Universidad de los Andes"
   Bogota - Colombia
    in progress

* Re-Certification of 
   BEIJING-CNIC-LCG2-IA64
   Beijing - China
    in progress

* Business as usual with tickets


ROC CERN (C5 Report on 8-May-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* Request to join received by the site
   
            Uniandes
   
   "Universidad de los Andes"

   Bogota - Colombia

   Certificaton in progress



ROC CERN (C5 Report on 24-Apr-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* Nothing to report



ROC CERN (C5 Report on 3-Apr-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* COD week for Cern ROC
* GGUS ticket processing: 
  The bug in GGUS blocking sometimes updates to/from
  PRMS/Remedy was fixed. Just after the fix the backlog of 
  missing updates was re-processed by GGUS. This 
  caused a "storm" of non-synchronised updates which
  in some cases re-opened tickets already closed tickets. 
  In some others cases (more annoying for remedy supporters) 
  the updates created new remedy tickets.
  We cleaned-up the situation at our best but spurious entries 
  in open Remedy tickets could still be present.



ROC CERN (C5 Report on 20-Mar-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* Business as usual with tickets
* A bug in GGUS was found blocking sometimes updates coming 
  from PRMS/Remedy. The bug is understood. While waiting for the
  solution, Remedy supporters (namely Cern ROC and CERN-PROD) should
  be aware that, from time to time, their updates may not be passed 
  timely to GGUS (they depend in this case on the mediation done by Cern ROC)
  Unfortunately the occurrence of this issue is not easily predictable. 
  Therefore it is better to check and monitor carefully critical updates/requests 
  to the end-users in case the replies are noticed to be delaying. 


ROC CERN (C5 Report on 13-Mar-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* Business as usual with tickets



ROC CERN (C5 Report on 28-Feb-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* COD week for ROC CERN

ROC CERN (C5 Report on 14-Feb-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* Nothing to report


  • 2007-01-31(1): Task: Cern ROC Procedures Details: A new agreement was reached with FIO about the presentation of tickets to the morning meeting: The list will not be anymore discussed regularly on Wednesday morning. At the same time, if the Cern ROC gets aware that one or more tickets are not being followed up properly, they will send the usual spreadsheet to the prod admin mailing list and the list will be discussed the morning after. The discussion is not bound to happen necessarily on Wednesday, but can be initiated at any day of the week. Status: Done . Antonio

ROC CERN (C5 Report on 31-Jan-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* Site SDU-LCG2, previously suspended, was re-integrated 
  in production after they fixed the LFC publishing issue

* Business as usual with tickets



ROC CERN (C5 Report on 24-Jan-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* COD week for ROC CERN


ROC CERN (C5 Report on 17-Jan-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* Business as usual with tickets

* The SDU-LCG2 site, within the reconfiguration of the site,
   started publishing by mistake a second instance
   of the central LFC catalog for Atlas, which could have severely 
   affected Atlas users.
   The site could not be fixed because the
   timezone was unfavourable to communication,
   So it was suspended immediately with an emergency 
   resolution. No reports from the VOs were received about
   effects on the datasets.


ROC CERN (C5 Report on 10-Jan-08)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* Nothing to report


ROC CERN (C5 Report on 19-Dec-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* The site PPS-SWITCH moved from Cern ROC to DECH ROC


  • 2007-12-14(1): Task: Cern ROC sites Details: PPS-SWITCH moves for Cern ROC to DECH ROC Status: Done . Antonio

  • 2007-12-02(1): Task: Wiki Details: Roles of proactive and reactive rocs distinguished in the task description. Script to seek roc-on-duty modified Status: Done . Antonio


ROC CERN (C5 Report on 25-October-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* re-certification of suspended site BEIJING-CNIC-LCG2-IA64
   in progress
* certification of McGill's Tier2 in progress
* Revising Certification and Re-certification procedures 
  (with related documentation and twiki). In progress
* Preparing for testing the GGUS6 portal (and interaction with CERN Remedy system) 
   with Alistair Mills. Tests will start on Monday, October 29th
* dteam VO administration: 'lcgadmin' role revoked for most part of the users in 
   group /dteam following a GGUS ticket reporting a potential security issue


  • 2007-10-22(1): Task: ROC Certification/Re-certification procedures Details: Revising Certification and Re-certification procedures (with related documentation and twiki) Status: In Progress . Domenico

  • 2007-10-24(1): Task: Support Details: Preparing for testing the GGUS6 portal (and interaction with CERN Remedy system) with Alistair Mills. Tests will start on Monday, October 29th Status: In Progress . Domenico

  • 2007-10-25(1): Task: dteam VO administration Details: LCGadmin role removed for most part of the users in group /dteam following a GGUS ticket Status: Done . Antonio

  • 2007-10-25(1): Task: Website Details: Added link to the ROC worklog to the CERN-ROC portal Status: Done . Domenico


ROC CERN (C5 Report on 18-October-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------
* re-certification of suspended site BEIJING-CNIC-LCG2-IA64
   started
* certification of McGill's Tier2 in progress

   

ROC CERN (C5 Report on 27-September-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* UFRJ - Universidade Federal do Rio de Janeiro is just starting the  
  certification of their Grid cluster with the help of CERN
   

ROC CERN (C5 Report on 20-September-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* BEIJING-CNIC-LCG2-IA64 site is suspended.
* McGill LCG (Canada) site has one test to pass and the contact email should be changed.
   

  • 2007-09-12(1): Task: Roc on duty Details: New shifts available (till December) Status: Done . Antonio

  • 2007-09-11(1): Task: Web Site Details: XSS vulnerability fixed in index.php script Status: Done . Antonio


ROC CERN (C5 Report on 23-August-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* FCR coordinates added in web page describing the central BDII configuration file. 
http://egee-roc-cern.web.cern.ch/egee-roc-cern/index.php?dir=./bdii/&
* Considering possible suspension of BEIJING-CNIC-LCG2-IA64 site.
* Dteam VO Administration: Actions undertaken in order to revoke the 
   role "lcgadmin" from a list of users (see GGUS-Ticket-ID: #22814)
 
   

  • 2007-08-20(1): Task: Website Details: FCR coordinates added in web page describing the central BDII configuration file.
http://egee-roc-cern.web.cern.ch/egee-roc-cern/index.php?dir=./bdii/& Status: Done . Antonio

  • 2007-08-13(1): Task: GGUS Details: New support unit OCC requested Status: Done . Antonio


  • 2007-07-10(1): Task: Web site. Details: Links to GOCDB updated. Status: Done . Antonio.


ROC CERN (C5 Report on 02-August-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* Certification of SDU-LCG2: In progress
   - immediately fails due to broken BEIJING-LCG2 BDII
   

ROC CERN (C5 Report on 05-Jul-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* Certification of SDU-LCG2: In progress
   - "never seen" issue with DPM found. we are in a loop with
     site admins and developers to solve it

* Bug submitted to GOCDB3 with a number of small operational issues
  with the new interface

* Coordination of staged BDII upgrade  (Update 27) in the region
   

ROC CERN (C5 Report on 21-Jun-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* Registration/certification of new site UFRJ (Rio de Janeiro, Brazil)
   started

* We have got a number of open GGUS ticket concerning the site YerPhI (AM):
   basically all tickets are to be reconducted to the poor network connection
   and to recently discovered firewall issues in the network route to the Armenian
   site. The network issues are under investigation by people in Cern ROC (Steve Traylen)
   and GD group  (Maarten Litmaath)
   

  • 2007-06-06(2): Task: Web Site Details: Link to intervention procedures created and advertised to sites. Status: Done . Antonio.

  • 2007-06-06(1): Task: Roc CoordinationDetails: Two mailing lists created: egee-roc-cern-certified-sites, egee-roc-cern-all-sites for communitation with sites in the Cern ROC Status: Done . Antonio.

  • 2007-05-25(1): Task: Site-Roc AssociationDetails: Document linked to SA1 web site Status: Done . Antonio.

  • 2007-05-24(2): Task: SAM ProdDetails: CT428861 (GGUS #22366) should be discussed on the next Operations Meeting. SAM Team cannot make decision about relaxing monitoring of local LFCs or changing the official port table Status: Reminder . Piotr.

  • 2007-05-24(1): Task: SAMAP (SAM Admin's Page)Details: I requested Rafal to add to SAMAP a feature for regular job submission for certification purposes. (Feature already in SFT2 Admins) Status: Done . Antonio.

  • 2007-05-14(1): Task: GRidVIEW Details: Change proposed to Phool Chand regarding list of short sitenames Status: Done . Antonio.

  • 2007-04-27(1): Task: ROC Remedy Details: Change proposed to Bill regarding assignment to external sites in Remedy Status: Done . Antonio.


ROC CERN (C5 Report on 26-Apr-07)

EGEE CERN Regional Operations Centre (ROC):
-------------------------------------------

* Registration of new site McGill LCG (Canada) in progress. Data inserted in the GOC DB

* Still several problems in the Remedy-->GGUS interface, mainly dealing 
   with e-mail parsing: All addressed
  

CERN ROC (Section Report on 26-Apr-07)

   * Tickets (last week)
      * Received: 13
      * Closed or re-directed: 13

   * Registration of new site McGill LCG (Canada) in progress. Data inserted in the GOC DB

   * Still several problems in the Remedy-->GGUS interface: All addressed
  
   * Configuration change requested in Remedy to support 3D tickets


  • 2006-04-25(4): Task: ROC Manager on Duty. Details: From 23/4 to 25/4 - New tickets: 7; Closed tickets: 11. Re-directed tickets:0 Status: Done . Antonio

  • 2006-04-25(3): Task: ROC Manager on Duty. Details: From Clean-up of stale tickets in Remedy. Status: Done . Antonio

  • 2007-04-25(2): Task: New site registration: McGill LCG Details: McGill LCG site registration progressing: Site data inserted in the GOCDB Status: Progress . Alexandre.

  • 2007-04-25(1): Task: ROC Remedy Details: New Case Type 3DStreams requested to Remedy in order to support 3D Streams tickets for BNL Status: Done . Antonio.

  • 2007-04-24(1): Task: PRMS --> GGUS interface Details: Two tickets submitted to GGUS for two different problems found . Status: Done . Antonio.


  • 2006-09-15(2): Task: SFT Details: Mail sent to administratos of sites under certification to warn them that SFt tests will be soon run as 'ops' . Status: Done . Antonio.

  • 2006-09-15(1): Task: SFT Details: Client reconfigured to use 'ops' VO Status: Done . Antonio.

  • 2006-08-12(1): Task: SFT. Details: CA-data updated. Status: Done . Antonio

  • 2006-09-06(1): Task: ROC Manager on Duty. Details: From 31/8 to 6/9 - New tickets: 12; Closed tickets: 16. Re-directed tickets:0 Status: Done . Antonio

  • 2006-08-29(3): Task: Documentation. Details: Wiki page on Cern ROC SFT updated. Now it describe in detail oaa the client instances we run. Status: Done . Antonio.

  • 2006-08-29(2): Task: SFT Details: Cern ROC instance separated from production one. Now submission to production done through Antun's RB, ROC submission through lxb2069. Status: Done . Antonio.

  • 2006-08-29(1): Task: Documentation. Details: Requested a meeting with Maria Ian Nick to discuss changes to be done to site registration policy. Status: Done . Antonio.

  • 2006-08-16(6): Task: SFT Details: bug fixed in post_install script which was preventing the system logs to be audited from the WMS Status: Done . Antonio.

=> C5 report

  • 2006-08-16(6): Task: SFT Details:new WMS lxb2069 installed. Bug Status: Done . Antonio.

  • 2006-08-16(5): Task: Documentation. Details: Version 04 of Site joining procedure created with comments form philippa and onjeng. Status: Done . Antonio.

  • 2006-08-16(4): Task: Site Certification: SWITCH. Details: E-maili sent to the site to propose to be certified in PPS. Status: Progress . Antonio.

  • 2006-08-16(3): Task: Documentation. Details: Page CERNROCRemedyTipsAndTricks created with tips and tricks to use remedy searches. Status: Done . Antonio.

  • 2006-08-16(2): Task: Documentation. Details: Delivery of a site in production documented among the procedures in the Cern ROC wiki. Page GoProductionTemplate created with template of e-mail to handle the delivery of a site in production. Status: Done . Antonio.

  • 2006-08-16(1): Task: Site Certification:BEIJING-CNIC-LCG2-IA64. Details: Site BEIJING-CNIC-LCG2-IA64 --> Certified. Status: Done . Antonio.

  • 2006-08-15(2): Task: SFT. Details:sft-apel test updated as requested by Frederich. Status: Done . Antonio

  • 2006-08-15(1): Task: Site Certification: BEIJING-CNIC-LCG2-IA64. Details: E-maili sent to the site to propose restore of status "Certified". Status: Progress . Antonio.

  • 2006-08-11(1): Task: SFT. Details: "ghost" replica removed following Sophie's indications. Proper fix done original LFN restored in the choose-good-SE script. Status: Done . Antonio


  • 2006-08-09(1): Task: SFT. Details: Problem affecting job submission. It was due to a "ghost" replica of the test file, which was causing the preliminary environmental checks to fail. Hot fix done changing the LFN in the choose-good-SE script. Status: Done . Antonio

  • 2006-08-08(2): Task: ROC Manager on Duty. Details: GGUS<->Remedy interface operational. Some issues still outstanding: 1) redirection of tickets assigned to ROCX CERN to other GGUS support unit. 2) communication with the end users. Status: Done . Antonio

  • 2006-08-08(1): Task: SFT. Details: CA-data updated. Status: Done . Antonio

  • 2006-08-7(3): Task: Cern ROC Web SiteDetails: First draft on-line http://www.cern.ch/ROC . Status: Done . Antonio.

  • 2006-08-7(2): Task: Site Certification: VICTORIA-LCG2 Details: Help to debug. Status: In Progress . Antonio.

  • 2006-08-07(1): Task: SFT. Details: Slowness of lxb2086 affecting SFT job submission. Status: Done . Antonio


  • 2006-08-2(2): Task: Site Certification: VICTORIA-LCG2 Details: VICTORIA-LCG2 --> Uncertified Status: In Progress . Antonio.

  • 2006-08-2(1): Task: Site Certification: VICTORIA-LCG2 Details: VICTORIA-LCG2 added to ROC BDII . Status: In Progress . Antonio.

  • 2006-07-31(3): Task: Certification Procedure. Details: In order to replace the CERN ROC SFT ,new SFT Admin Page was tested: could submit regular jobs to Switch (PPS) but not to uncertified production sites. feedback sent to Rafal Likwala Status: Progress . Antonio

  • 2006-07-31(1): Task: Site Certification:BNL-LCG2. Details: Site BNL-LCG2 --> Certified. Status: Done . Antonio.

  • 2006-07-28(3): Task: Site Certification:BNL-LCG2. Details: E-maili sent to BNL-LCG2 to propose restore of status "Certified". Status: Progress . Antonio.

  • 2006-07-28(2): Task: Documentation. Details: Site-ROC association process changed (0.3: Suggestions by Florida) . Status: Done . Antonio.

  • 2006-07-28(1): Task: SFT. Details: CA-data updated. Status: Done . Antonio

  • 2006-07-21(1): Task: SFT. Details: SFT broken as CNAF SE not available. Instance re-configured to use srm.cern.ch. Submission scripts fixed to use the correct BDII and the PPS AFS ui. Changes logged in the wiki. Status: Done . Antonio

  • 2006-07-20(2): Task: ROC Manager on Duty. Details: New tickets: 3; Closed tickets: 2. Re-directed tickets:0 Status: Done . Antonio

  • 2006-07-20(1): Task: CERN-ROC Management. Details: Site BNL-LCG2 Uncertified. Status: Done . Antonio.

  • 2006-07-19(1): Task: ROC Manager on Duty. Details: New tickets: 5; Closed tickets: 3. Re-directed tickets:0 Status: Done . Antonio

  • 2006-07-18(1): Task: ROC Manager on Duty. Details: New tickets: 0; Closed tickets: 1. Re-directed tickets:0 Status: Done . Antonio

  • 2006-07-17(1): Task: ROC Manager on Duty. Details: New tickets: 6; Closed tickets: 4. Re-directed tickets:0 Status: Done . Antonio

  • 2006-07-06(2): Task: ROC Manager on Duty. Details: New tickets: 4; Closed tickets: 6. Re-directed tickets:0 Status: Done . Antonio

  • 2006-07-06(1): Task: CERN-ROC Management. Details: Site SDU-LCG2 Suspended. Status: Done . Antonio.

  • 2006-07-05(1): Task: ROC Manager on Duty. Details: New tickets: 2; Closed tickets: 4. Re-directed tickets:1 Status: Done . Antonio

  • 2006-07-04(2): Task: ROC Manager on Duty. Details: New tickets: 1; Closed tickets: 5. Re-directed tickets:0 Status: Done . Antonio

  • 2006-07-04(1): Task: CERN-ROC Management. Details: Suspension proposal sent to SDU-LCG2. Status: Done . Antonio.

  • 2006-07-03(2): Task: ROC Manager on Duty. Details: New tickets: 5; Closed tickets: 4. Re-directed tickets:2 Status: Done . Antonio

  • 2006-07-03(1): Task: Documentation. Details: Wiki page FrozenTicket created with template of e-mail to send to users when their ticket is being set to unsolved. Status: Done . Antonio.

  • 2006-06-30(2): Task: ROC Manager on Duty. Details: New tickets: 3; Closed tickets: 3. Re-directed tickets:1 Status: Done . Antonio

  • 2006-06-30(1): Task: Recover form R-GMA critical bug Details: Daily check on R-GMA. Status: Done . Antonio

  • 2006-06-29(2): Task: ROC Manager on Duty. Details: New tickets: 3; Closed tickets: 8. Re-directed tickets:2 Status: Done . Antonio

  • 2006-06-29(1): Task: Recover form R-GMA critical bug Details: Daily check on R-GMA. Status: In progress . Antonio

  • 2006-06-28(2): Task: ROC Manager on Duty Details: New tickets: 2; Closed tickets: 11. Status: Done . Antonio

  • 2006-06-28(1): Task: Recover form R-GMA critical bug Details: Daily check on R-GMA, sites belonging to CERN ROC contacted to apply the fix. Status: In progress . Antonio

  • 2006-06-27(2): Task: ROC Manager on Duty Details: New tickets: 2; Closed tickets: 7. Status: Done . Antonio

  • 2006-06-27(1): Task: CERN-ROC Management Details: request sent to CNAF to use their gLite WMS as default for production lxplus UI . Status: Done . Antonio.

  • 2006-06-26(2): Task: ROC Manager on Duty Details: New tickets: 8; Closed tickets: 8. Status: Done . Antonio

  • 2006-06-26(1): Task: ROC Management Details: ROC report and CERN-PROD report written. Status: Done . Antonio

  • 2006-06-23(3): Task: ROC Manager on Duty Details: New tickets: 14; Closed tickets: 13. Status: Done . Antonio

  • 2006-06-23(2): Task: SFT. Details: Detail about CERN ROC installation sharet with Judit and Piotr. Wiki page edited with CA maintenance procedure. Status: Done . Antonio

  • 2006-06-22(1): Task: SFT. Details: CA test updated. Status: Done . Antonio

  • 2006-06-21(3): Task: Certification Procedure. Details: Rafal Likwala contacted to replace the CERN ROC SFT with the Admin Page Status: Done . Antonio

  • 2006-06-21(2): Task: Documentation. Details: Site-ROC association process changed (0.2) Status: Done. . Antonio.

  • 2006-06-21(1): Task: Documentation. Details: Site-ROC association process document written (0.1) Status: Done. . Antonio.

  • 2006-06-20(3): Task: Site Certification: VICTORIA-LCG2 Details: Site information for GOC DB elaborated and sent for confirmation. Status: In Progress . Antonio.

  • 2006-06-20(2): Task: SFT Details: CA test updated (again). Status: Done . Antonio.

  • 2006-06-20(1): Task: SFT Details: CA test updated. Status: Done . Antonio.

  • 2006-06-19(2): Task: SFT Details: Problem with central SE fixed. Jobs were not sent for three days. Status: Done . Antonio.

  • 2006-06-19(1): Task: Site Certification: VICTORIA-LCG2 Details: contact verification started. Status: In Progress . Antonio.

  • 2006-06-15(1): Task: Site Certification:PPS-SWITCH Details: JL failing. Error found in the CE name in the GOC db. Status: In Progress . Antonio.

  • 2006-06-13(1): Task: ROC Administration. Details: Reply to VECC/Kolkata/India. Asked to contact APROC. Status: Done . Antonio.

  • 2006-06-12(1): Task: SFT test for production Details: Target Storage Element changed to CNAF one. Several GGUS ticket closed. Status: Done . Antonio.

  • 2006-06-1(1): Task: Help to production Details: CERN-ROC SFT temporarily re-configured to run tests against production gLite CEs . Status: Done . Antonio.

  • 2006-05-31(1): Task: CERN-ROC Management Details: ACL set for dir /afs/cern.ch/project/gd/egee/www/roc-cern/shift . Status: Done . Antonio.

  • 2006-05-30(1): Task: Certification Procedure. Details: ROC BDII configuration changed. Now also all the production sites are inclued in order to minimize the changes to configuration needed by sites undergoing the certification. Status: Done . Antonio

  • 2006-05-24(2): Task: Documentation. Details: Wiki page ROCSFTInstallation created with details of SFT instance for ROC CERN. Status: Done . Antonio.

  • 2006-05-23(3): Task: Certification Procedure. Details: ROC BDII configuration changed. Now also CERN-PPS is included in order to access services needed by the SFT, namely central SE and catalog. Status: Done . Antonio.

  • 2006-05-23(2): Task: Site Certification:BEIJING-CNIC-LCG2-IA64. Details: RM failing. They need to change their batch to use the ROC BDII on lxb2086 if they want to pass tests for local copy. Status: In Progress . Antonio.

  • 2006-05-23(1): Task: Site Certification:PPS-SWITCH Details: JL failing. Probably a firewall problem accessing site BDII. Status: In Progress . Antonio.

  • 2006-05-19(1): Task: Certification Procedure. Details: SFT tests for gLite and LCG CEs merged to use gLite WMS. Status: Done . Antonio.

  • 2006-05-16(1): Task: Certification Procedure. Details: WMS+EGEE.BDII set-up on lxb2086 to support SFT instances for ROC. Status: Done . Antonio.

  • 2006-05-5(1): Task: CERN-ROC Management Details: Site CARLETONU-LCG2 Suspended. Status: Done . Antonio.

  • 2006-05-3(1): Task: CERN-ROC Management Details: Site BEIJING-CNIC-LCG2-IA64 Suspended. Status: Done . Antonio.

  • 2006-05-2(1): Task: CERN-ROC Management Details: Site HPTC-LCG2ia64 Suspended. Status: Done . Antonio.

  • 2006-04-25(2): Task: Certification Procedure. Details: Two new instances of the SFT client created to support the certification of new and suspended sites belonging to CERN-ROC Status: Done . Antonio.

  • 2006-04-25(2): Task: Documentation. Details: Entry in the GOC wiki for Apel problems affecting sites working with double CEs. Status: Done . Antonio.

  • 2006-04-25(1): Task: Definition of internal procedures. Details: work log started. Status: Done. Antonio

-- Main.aretico - 25 Apr 2006

Edit | Attach | Watch | Print version | History: r105 < r104 < r103 < r102 < r101 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r105 - 2009-07-23 - FaridaNaz
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LCG All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback