Operations Telecom 2011-10-11
Participation
Sites represented:
Site |
Participant |
CH-CERN |
Edoardo Martelli, John Shade |
DE-KIT |
Aurelie Reymund, Bruno Hoeft |
ES-PIC |
Fernando López Muñoz |
IT-INFN-CNAF |
Stefano Zani |
Apologies:
Operations Overview
During time-window [2011-07-01, 2011-09-30]:
- 91 tickets: 37 (40.5%) IL2, 49 ML2 (54%), 5 ML3 (5.5%)
- Kind of problem: 78 connectivity issues (85%), 13 performance issue (15%),
- Loss of Service --> 9 tickets only (10%)
Distribution of tickets' assignments was as following:
Remaining issues (
https://gus.fzk.de/pages/all_lhcopn.php ) :
Operations KPIs
Events matching per T1s:
- Events matching per Tier-1:
•Computed from
https://cclhcopnmon.in2p3.fr/LHCOPN/report/
Regular backup tests:
Site |
Date of last backup test report |
Have we a report since 1 year? |
CA-TRIUMF |
2008-06-03 |
KO |
CH-CERN |
2008-06-03 |
KO |
DE-KIT |
2011-08-16 |
OK (partly) |
ES-PIC |
2011-05-05 |
OK (partly) |
FR-CCIN2P3 |
2010-03-08 |
KO |
IT-INFN-CNAF |
2008-04-09 |
KO |
NDGF |
2008-04-09 |
KO |
NL-T1 |
2009-02-10 |
KO |
TW-ASGC |
2010-12-28 |
OK |
UK-T1-RAL |
2010-08-24 |
KO |
US-FNAL-CMS |
2008-04-24 |
KO |
US-T1-BNL |
2008-06-03 |
KO |
Site Reports
CA-TRIUMF
- All 47 tickets related to IL2 or ML2 were caused by carriers interruptions or maintenance.
CH-CERN
- CERN LHCOPN Force10 router 2 replaced with Brocade MLX16. All the linnks moved.
- New Brocade which will replace CERN LHCOPN Force10 router 1 is in place. Move of the links will start with KIT on 13th/10/11.
DE-KIT
- At "DANTE POP@Frankfurt" pering point with DFN was a defect transpoder card replaced (Friday, 19th August 2011) :: Ticket-ID: 74345
- expand capacity between DE-KIT and FNAL with 1GE
- 2GE DE-KIT – US-FNAL-CMS (Tuesday, 16th August 2011)
ES-PIC
- CERN-PIC-LHCOPN-001-10G-P and CERN-PIC-LHCOPN-002-1G-B now pass through RedIris NOVA
- All the non matching events caused due no notification from RedIris NOC
FR-CCIN2P3
IT-INFN-CNAF
NDGF
NL-T1
TW-ASGC
- A 2.5G IPLC from Taipei to Geneva via Chicago and Amsterdam has been setup since Sept. 12,2011. Part of functions of the link will be as a LHCOPN backup link between ASGC and CERN.
UK-T1-RAL
US-FNAL-CMS
- Bandwidth increase on NL-T1/DE-KIT link to 2GE, as mentioned by Bruno.
- Misc. fiber outages.
- USLHCnet E600 at StarLight lost power causing outage. (2011-08-24)
- My apologies - won't be able to attend teleconference.
US-T1-BNL
AOB
- GGUS ticketing system
The following changes at the GGUS LHCOPN ticketing system are proposed:
- LHCOPN Ticket mask/"lay out" does not change
- a LHCOPN user will see the ticket as it is today
- for a “non” LHCOPN user the ticket layout will change to the LHCOPN ticket style
- all LHCOPN Tickets are visible (view only) to members of the GGUS wlcg ticket system
- tickets are referenced in both directions between the GGUS LHCOPN ticket system and the GGUS WLCG ticket system (1:1 relation)
- Changes will be discussed with GGUS developer team
- changes are asked to be implemented in an LHCOPN ticket testenv
- url for LHCOPN ticket testenv will be send to all OPS-WG contacts for evaluation and
the url will replace this line
Next Ops Phoneconf
The next Teleconference was scheduled for 17th Jan. 2012 16:30 CET
--
BrunoHoeft - 04-Oct-2011