The ATLAS Muon Spectrometer

Action Items

Modified 27 Nov 2002 by Steven Goldfarb

Item Action Taken Date Status
BMS Spacer Design for cut-out in Sector 8     pending
Position of connections and electronics in BML, BMS, BOL   June Muon Week pending decision (and cost) on mezzanine-CSM cable
Evaluate consequences on number of chambers w/o diagonal in-plane beams, due to layout changes     pending
New design for EIL4 supports in feet sectors and sectors 1,7,9 EIL4 note and maquettes have been updated   pending
Clearance problems in BMF installation TC agrees to reduce thickness of cable tray; RPC to follow up   pending
Conflict between EES and connection box bolts Change in connection box design, needs to be re-evaluated December pending
Conflict between feet and low rapidity forward alignment ray ECR has been issued next week pending
Increased size of connection boxes and voussoirs interferes with BIR chambers Asked Magnet PL to make an ECR December pending
Access scenarios to all barrel chambers preliminary access way to be prepared December pending
Need access to front-end electronics in EIL1-EIS1 (high rad area) access scenario to be prepared December pending
Check deformations of EIL4 and EES, EEL frames, to ensure design of chambers and mounting can start   end October prepared by Spigo