Date | Title | Agenda | Minutes | Link to presentation(s) |
---|---|---|---|---|
23.09.2019 | Ad-Hoc Meeting 5: Alignment BT-BTM-BTP | (Agenda) | (Minutes) | |
21.08.2019 | Ad-Hoc Meeting 4: EN-CV Specs for Temporary Solution for PSB Tests | (Agenda) | (Minutes) | EN-CV Specifications for Temporary Solution for PSB Tests, D. Hay |
24.06.2019 | Ad-Hoc Meeting 3: BI/BT Line Drawings/Marking/Drilling | (Agenda) | (Minutes) | BI Line Verification, J.P. Corso BI Transfer Line Checks, C. Bracco |
03.06.2019 | Ad-Hoc Meeting 2: BI/BT Line Drawings/Marking/Drilling | (Agenda) | (Minutes) | Status BI/BT Line Drawings/Marking/Drilling, M. Atanasov |
29.05.2019 | Ad-Hoc Meeting 1: EN-CV LS2 Activities on Critical Path | (Agenda) | (Minutes) | EN-CV: Brief Status and Issues, D. Hay |
28.05.2019 | LIU-PSB TCM 3 | (Agenda) | (Minutes) | PSB LS2 Shutdown Activities: Brief Status and Issues, D. Hay IST Preparation, F. Chapuis |
19.02.2019 | LIU-PSB TCM 2 | (Agenda) | (Minutes) | Injection Area 1L1, W. Weterings |
05.02.2019 | LIU-PSB TCM 1 | (Agenda) | (Minutes) | Project re-organisation, G.P. Di Giovanni PSB LS2 Activities, D. Hay |
Date | Title | Agenda | Minutes | Link to presentation(s) |
---|---|---|---|---|
04.12.2018 | PS Booster Upgrade Working Group Meeting 226 | (Agenda) | (Minutes) | Linac4-to-PSB LS2 schedule, J. Coupard Update on the ECRs, T. Birtwistle |
06.11.2018 | PS Booster Upgrade Working Group Meeting 225 | (Agenda) | (Minutes) | WPA and PSB master schedule, D. Hay Update on the ECRs, T. Birtwistle |
23.10.2018 | PS Booster Upgrade Working Group Meeting 224 | (Agenda) | (Minutes) | Commissioning of the new PSB wire scanner, J. L. Sirvent Blasco EVM report, S. Prodon |
09.10.2018 | PS Booster Upgrade Working Group Meeting 223 | (Agenda) | (Minutes) | Transmission measurement of all the PSB machine, F. Schmidt |
25.09.2018 | PS Booster Upgrade Working Group Meeting 222 | (Agenda) | (Minutes) | TE-VSC activities and status, J. A. Ferreira Somoza Status of the ECRs, T. Birtwistle |
11.09.2018 | PS Booster Upgrade Working Group Meeting 221 | (Agenda) | (Minutes) | Status of the electrical and pressure conformity files, A. Funken TE-MSC activities and status, A. Newborough LIU-PSB EVM status, S. Prodon |
28.08.2018 | PS Booster Upgrade Working Group Meeting 220 | (Agenda) | (Minutes) | Status of the LIU-PSB Safety File and next steps, A. Funken EN-CV activities and status, G. Petrika PSB and Linac 4 Applications Development during LS2, J-F. Comblin |
31.07.2018 | PS Booster Upgrade Working Group Meeting 219 | (Agenda) | (Minutes) | EN-EL activities and status and post mortem analysis during YETS, J. Devine Signal and DC cabling and de-cabling activities, G. Minchev Georgiev Status of the ECRs and integration studies, T. Birtwistle and Y. Muttoni |
17.07.2018 | PS Booster Upgrade Working Group Meeting 218 | (Agenda) | (Minutes) | EN-CV Activities in B245, J-P. Rodary Report on the ECRs for LS2, T. Birtwistle |
03.07.2018 | PS Booster Upgrade Working Group Meeting 217 | (Agenda) | (Minutes) | Update on the POPs-B, F. Boattini |
19.06.2018 | PS Booster Upgrade Working Group Meeting 216 | (Agenda) | (Minutes) | WP analysis for LS2, D. Hay Report on the ECRs for LS2, T. Birtwistle |
22.05.2018 | PS Booster Upgrade Working Group Meeting 215 | (Agenda) | (Minutes) | Status of H0/H- Electronics, SEM Grids in LBE and PSB WS Prototype, F. Roncarolo Report on the ECRs for LS2, T. Birtwistle |
08.05.2018 | PS Booster Upgrade Working Group Meeting 214 | (Agenda) | (Minutes) | EVM PSB Update, S. Prodon Report on the ECRs for LS2, T. Birtwistle |
17.04.2018 | PS Booster Upgrade Working Group Meeting 213 | (Agenda) | (Minutes) | LN-to-PSB connection project, A. Berjillos Barranco Report on the ECRs for LS2, T. Birtwistle PSB Transmission Line Measurements, F. Schmidt |
03.04.2018 | PS Booster Upgrade Working Group Meeting 212 | (Agenda) | (Minutes) | Q-strip specifications with respect to beam dynamics F. Antoniou LIU PSB Q-strip power converters L. De Mallac |
20.03.2018 | PS Booster Upgrade Working Group Meeting 211 | (Agenda) | (Minutes) | POPs-B power converter report, F. Boattini Update on the design of the BTP stopper, E. Grenier-Boley Report on the ECRs for LS2, T. Birtwistle |
06.03.2018 | PS Booster Upgrade Working Group Meeting 210 | (Agenda) | (Minutes) | Report on the LS2 schedule, D. Hay Transformers: intervention scenarios and spare policy, D. Aguglia Final LS2 readiness document, J. Coupard Report on the ECRs for LS2, T. Birtwistle |
20.02.2018 | PS Booster Upgrade Working Group Meeting 209 | (Agenda) | (Minutes) | LIU-PSB MDS and studies: 2018, S. Albright Follow-up on the Installation Readiness for LS2, J. Coupard Follow-up on the ECR for LS2, T. Birtwistle EVM PSB Update, S. Prodon |
06.02.2018 | PS Booster Upgrade Working Group Meeting 208 | (Agenda) | (Minutes) | POPS-B project follow-up, F. Boattini PSB Heating system removal YETS pilot project & LS2 , G. Petrika |
16.01.2018 | PS Booster Upgrade Working Group Meeting 207 | (Agenda) | (Minutes) | Thermomechanical simulations on the PSB scraper, I. Lamas Garcia Preliminary design of the BTP line, B. Riffaud LIU-PSB EVM Update, S. Prodon |
05.12.2017 | PS Booster Upgrade Working Group Meeting 206 | (Agenda) | (Minutes) | Update on B-train measurements, M. Buzio Proposal of vacuum chambers for BHZ151 and associated magnets, J. A. Ferreira Somoza |
21.11.2017 | PS Booster Upgrade Working Group Meeting 205 | (Agenda) | (Minutes) | Update on the heating system removal intervention in the PSB tunnel, G. Petrika Building 245 – État général des travaux génie civil, H. Botella Esteban LIU-PSB EVM Status, S. Prodon |
07.11.2017 | PS Booster Upgrade Working Group Meeting 204 | (Agenda) | (Minutes) | PS Complex Layout Database Refurbishment and Post-LS2 Version, T. Birtwistle Injector Optics Repository - Status Update, I. Efthymiopoulos |
24.10.2017 | PS Booster Upgrade Working Group Meeting 203 | (Agenda) | (Minutes) | TFB Update, A. Blas LIU-PSB EVM Update, S. Prodon |
10.10.2017 | PS Booster Upgrade Working Group Meeting 202 | (Agenda) | (Minutes) | Cabling for YETS 17-18 in PSB, G. M. Georgiev New BPM in the BI line, C. Hessler ECR for the coming YETS and LS2, J. Coupard |
26.09.2017 | PS Booster Upgrade Working Group Meeting 201 | (Agenda) | (Minutes) | Current Status of the PSB Scraper Study, I. Lamas Garcia LIU-PSB EVM Update, S. Prodon Injection Q-strips, L. De Mallac |
12.09.2017 | PS Booster Upgrade Working Group Meeting 200 | (Agenda) | (Minutes) | Update on the BPM in the BI line request, K. Hanke |
29.08.2017 | PS Booster Upgrade Working Group Meeting 199 | (Agenda) | (Minutes) | Report on the Installation of the New Wirescanner during TS3, R. Veness LIU-PSB EVM Update, S. Prodon Follow-up on the Installation Readiness for LS2, J. Coupard Additional BPMs in the PSB Transfer Lines, G. P. Di Giovanni |
01.08.2017 | PS Booster Upgrade Working Group Meeting 198 | (Agenda) | (Minutes) | Update on the PSB Cooling and Ventilation Systems G. Petrika |
18.07.2017 | PS Booster Upgrade Working Group Meeting 197 | (Agenda) | (Minutes) | Update on the PSB Transfer Lines C. Hessler |
04.07.2017 | PS Booster Upgrade Working Group Meeting 196 | (Agenda) | (Minutes) | Follow-up on the B-train M. Buzio |
20.06.2017 | PS Booster Upgrade Working Group Meeting 195 | (Agenda) | (Minutes) | Status of SEM Grids for Injection Matching J. Tan LIU-PSB EVM S. Prodon |
06.06.2017 | PS Booster Upgrade Working Group Meeting 194 | (Agenda) | (Minutes) | RF bypass measurements in PS with high intensity beams J. Ferreira Bento |
23.05.2017 | PS Booster Upgrade Working Group Meeting 193 | (Agenda) | (Minutes) | Follow up of the new PSB injection from the HST W.Weterings B245 Modifications and Cabling Update F. Boattini |
09.05.2017 | PS Booster Upgrade Working Group Meeting 192 | (Agenda) | (Minutes) | RF bypass impedence measurements, J. Ferreira Bento Update on the recombination kickers, V. Forte, L. Sermeus Linac4 connection, K. Hanke LIU-PSB EVM, S. Prodon ECR status for Linac4 connection, A. Berjillos Barranco, J. Coupard |
25.04.2017 | PS Booster Upgrade Working Group Meeting 191 | (Agenda) | (Minutes) | BLMs installation status, C. Zamantzas |
11.04.2017 | PS Booster Upgrade Working Group Meeting 190 | (Agenda) | (Minutes) | BT, BTM and BTP integration, J-M Lacroix Cancel MPS ripples with BDLs, I. Josifovic |
28.03.2017 | PS Booster Upgrade Working Group Meeting 189 | (Agenda) | (Minutes) | Booster MDs, F. Schmidt LIU-PSB EVM Status, S. Prodon |
14.03.2017 | PS Booster Upgrade Working Group Meeting 188 | (Agenda) | (Minutes) | Thermo-structural analysis on a UHV gate valve, A. Pilan Zanoni |
28.02.2017 | PS Booster Upgrade Working Group Meeting 187 | (Agenda) | (Minutes) | BRF2-bunker PSB, A. Martinez Selles |
21.02.2017 | PS Booster/PS Upgrade Working Group Meeting 3 | (Agenda) | (Minutes) | The PSB, PS and TL Optics Repositories, I. Efthymiopoulos |
07.02.2017 | PS Booster Upgrade Working Group Meeting 186 | (Agenda) | (Minutes) | Feedback from POPS Explosion Analysis, F. Boattini De-cabling & cabling during EYETS 16-17 in the Booster, G. M. Georgiev |
17.01.2017 | PS Booster Upgrade Working Group Meeting 185 | (Agenda) | (Minutes) | Recombination Kicker Rise Time, L. Sermeus Recombination Kicker Waveform Measurements, V. Forte |
06.12.2016 | PS Booster Upgrade Working Group Meeting 184 | (Agenda) | (Minutes) | LIU-PSB Beam Dynamic Studies, E. Benedetto |
22.11.2016 | PS Booster Upgrade Working Group Meeting 183 | (Agenda) | (Minutes) | TE/VSC Simulation of the New Beam Scraper/Absorber, J. Hansen Thermo-structural Analysis on a UHV Gate Valve Hit by LIU-PSB Beam, A. Pilan-Zanoni Proposed Magnetic Cycle at 1.4 and 2 GeV, S. Albright |
08.11.2016 | PS Booster Upgrade Working Group Meeting 182 | (Agenda) | (Minutes) | Review of BI Equipment for the Linac4-to-PSB Connection, J. Tan |
01.11.2016 | PS Booster/PS Upgrade Working Group Meeting 2 | (Agenda) | (Minutes) | PSB RF Bypasses, A. Blas PS RF Bypasses, H. Damerau Plans for the New PSB B-Train during EYETS and BT.BHZ10 BTrain Option, M. Buzio Status of the LLRF for the New PS B-Train System, D. Perrelet |
04.10.2016 | PS Booster Upgrade Working Group Meeting 181 | (Agenda) | (Minutes) | Status/Preparation of the Control Applications for L4-to-PSB Connection, J. Sanchez-Alvarez Synchronization between Linac4 and PSB, E. Benedetto |
20.09.2016 | PS Booster Upgrade Working Group Meeting 180 | (Agenda) | (Minutes) | PSB Injection Mock-up Area/Stripping Foil Test Stand, W. Weterings |
06.09.2016 | PS Booster Upgrade Working Group Meeting 179 | (Agenda) | (Minutes) | Material Choice for the Vacuum Window at the Exit of BTM, C. Di Paolo EN-STI Activities in the Framework of LIU-PSB, I. Garcia Lamas |
16.08.2016 | PS Booster Upgrade Working Group Meeting 178 | (Agenda) | (Minutes) | HST Hardware Installation and Commissioning, G. Guidoboni |
19.07.2016 | PS Booster Upgrade Working Group Meeting 177 | (Agenda) | (Minutes) | Recombination Kicker Rise Time, L. Sermeus Recombination Kicker Waveform Measurements, V. Forte |
05.07.2016 | PS Booster Upgrade Working Group Meeting 176 | (Agenda) | (Minutes) | Cabling Commitment for LIU-PSB during EYETS, G.M. Georgiev PSB Beam Scrapers/Absorbers: Thermo-Mechanical Simulations, I. Lamas Garcia |
07.06.2016 | PS Booster Upgrade Working Group Meeting 175 | (Agenda) | (Minutes) | LS2 Master Schedule, J. Coupard POPS-B Project Update and Feedback from POPS Experience, F. Boattini TFB Amplifier Prototype, M. Paoluzzi |
24.05.2016 | PS Booster Upgrade Working Group Meeting 174 | (Agenda) | (Minutes) | Status of the Safety Files, L. Kobzeva Forecasts for Waste and Radioactive Material Storage, L. Kobzeva |
10.05.2016 | PS Booster Upgrade Working Group Meeting 173 | (Agenda) | (Minutes) | |
03.05.2016 | PS Booster/PS Upgrade Working Group Meeting 1 | (Agenda) | (Minutes) | Complementary Measurements on the Main Dipole for the Booster B-Train System, A. Beaumont B-Train System, M. Buzio |
19.04.2016 | PS Booster Upgrade Working Group Meeting 172 | (Agenda) | (Minutes) | ECR/SSR for EYETS 2016/2017, J. Coupard PSB Beam Absorber/Scraper After LS2, M. Kowalska PSB Beam Absorber/Scraper After LS2, F.X. Nuiry |
05.04.2016 | PS Booster Upgrade Working Group Meeting 171 | (Agenda) | (Minutes) | PSB RF System Upgrade Availability Studies, O. Rey Orozco Field Control of TL Switching Dipole, M. Buzio |
22.03.2016 | PS Booster Upgrade Working Group Meeting 170 | (Agenda) | (Minutes) | MD Planning in 2016 for LIU-PSB, E. Benedetto EPC Planned Work for EYETS 2016, S. Pittet, PSB-PS Magnets Specifications, W. Bartmann |
08.03.2016 | PS Booster Upgrade Working Group Meeting 169 | (Agenda) | (Minutes) | Alignment Changes in the PSB after YETS 2015/2016, G.P. Di Giovanni Review of the Present Issues in the Alignment the PSB Equipment, T. Dobers Longitudinal Dynamic Simulations of PSB Beams in the LINAC4 Scenario, D. Quartullo |
23.02.2016 | PS Booster Upgrade Working Group Meeting 168 | (Agenda) | (Minutes) | Handling of Magnets BT.BHZ10 and BTM.BHZ10, C. Bertone Removal of CV Pipes in the PSB Injection Region, N. Roget |
09.02.2016 | PS Booster Upgrade Working Group Meeting 167 | (Agenda) | (Minutes) | Status of the PSB Transverse Feedback A. Blas |
19.01.2016 | PS Booster Upgrade Working Group Meeting 166 | (Agenda) | (Minutes) | Recombination Kicker Rise Time, L. Sermeus Review of the Optics of the PSB Extraction Lines, J. Abelleira Quadrupoles Trims for 2 GeV Operation/Tunes at Extraction, E. Benedetto |
10.12.2015 | PS Booster Upgrade Working Group Meeting 165 | (Agenda) | (Minutes) | Finement Project Review and Planning, M. Paoluzzi |
26.11.2015 | PS Booster Upgrade Working Group Meeting 164 | (Agenda) | (Minutes) | Status of the PSB Extraction and Recombination Septa and Kickers, J. Borburgh |
12.11.2015 | PS Booster Upgrade Working Group Meeting 163 | (Agenda) | (Minutes) | Injection Tests with Carbon Foils in ISIS, B. Jones |
05.11.2015 | PS Booster Upgrade Working Group Meeting 162 | (Agenda) | (Minutes) | Magnetic Measurement on PSB Dipoles Main and Injection Type, R. Chritin PSB BHZ Main Magnets and the Required Trims, A. Newborough Status of PSB B-train System Upgrade, M. Buzio |
22.10.2015 | PS Booster Upgrade Working Group Meeting 161 | (Agenda) | (Minutes) | Discussion about Review of the Present Issues in Alignment the PSB Equipment , T. Dobers Integration Issues of the BT-BTM-BTP Line, J.M. Lacroix Optics Changes Needed to Address the Integration Issues of the BT-BTM-BTP Line, J. Abelleira |
08.10.2015 | PS Booster Upgrade Working Group Meeting 160 | (Agenda) | (Minutes) | Pumping in Sections 4L1 and 11L1 for the Installation of the New Wire Scanners, F. Salveter Exchange Procedure for the Stripping Foil, W. Weterings Status of the Test Stand of the Stripping Foil, W. Weterings |
24.09.2015 | PS Booster Upgrade Working Group Meeting 159 | (Agenda) | (Minutes) | Review of the Optics of the PSB Extraction Lines, J. Abelleira Stability Studies of the PSB-PS Extraction Line, W. Bartmann |
17.09.2015 | PS Booster Upgrade Working Group Meeting 158 | (Agenda) | (Minutes) | Requests to EN/EL for the LIU-PSB, G.M. Georgiev Status of the Ongoing Activities in B245, L.A. Lopez-Hernandez Status Report about Installation, Transport and Handling, C. Bertone |
03.09.2015 | PS Booster Upgrade Working Group Meeting 157 | (Agenda) | (Minutes) | Requests to EN/EL for the LIU-PSB, G.M. Georgiev Rack Layout for the Finemet Cavities, M. Haase Planning of the LIU-PSB Activities (YETS/EYETS/LS2), J. Coupard |
27.08.2015 | PS Booster Upgrade Working Group Meeting 156 | (Agenda) | (Minutes) | Requests to EN/EL for the LIU-PSB, G.M. Georgiev Discussion about the ECR PSB-LJ-EC-0001, O. Berrig Results from the LV Measurement Campaign, J. Devine |
06.08.2015 | PS Booster Upgrade Working Group Meeting 155 | (Agenda) | (Minutes) | Follow-up of the Shielding Simulation for the HST, M. Morgenstern |
16.07.2015 | PS Booster Upgrade Working Group Meeting 154 | (Agenda) | (Minutes) | Requests to EN/EL for the LIU-PSB, G.M. Georgiev Discussion about Review of the Present Issues in Alignment the PSB Equipment , T. Dobers. |
02.07.2015 | PS Booster Upgrade Working Group Meeting 153 | (Agenda) | (Minutes) | Requests to EN/EL for the LIU-PSB, G.M. Georgiev Status of the Beam Intercepting Devices Equipment for the 2.0 GeV Upgrade, D. Grenier Alternative Solution for the Vacuum Window at the Exit of BTM and Experience with the Beam Dump Temperature Measurements, A. Perillo Marcone |
25.06.2015 | PS Booster Upgrade Working Group Meeting 152 | (Agenda) | (Minutes) | Warm Magnet Interlock System, M. Zerlauth Requests to EN/EL for the LIU-PSB G.M. Georgiev |
18.06.2015 | PS Booster Upgrade Working Group Meeting 151 | (Agenda) | (Minutes) | BRF2 Integration Model Status, Y. Muttoni Requests to EN/EL for the LIU-PSB, G.M. Georgiev Organization for LIU: Power Distribution, J. Devine Shielding Simulation for the HST M. Morgenstern |
04.06.2015 | PS Booster Upgrade Working Group Meeting 150 | (Agenda) | (Minutes) | Safety Packages Proposal, K. Hanke B245 Construction Status, K. Hanke Requests to EN/EL for the LIU-PSB, G.M. Georgiev PSB Finemet Cavities LS2 Rack Space Request, M. Haase End-2016 Readiness for the Beam Interlock System, B.Puccio End-2016 Readiness for the RF Bypasses and TFB Electronics, A. Blas End-2016 Readiness for Controls, J. Betz End-2016 Readiness for Applications, J. Sanchez-Alvarez |
21.05.2015 | PS Booster Upgrade Working Group Meeting 149 | (Agenda) | (Minutes) | Progress on LIU-PSB Upgrade Work Activities, D. Hay Collect Needs for Cooling And Ventilation, S. Moccia Requests to EN/EL for the LIU-PSB, G.M. Georgiev Status of Readiness for End-2016 Deadline for L4 Connection for WP 9.2, W. Weterings Status of Readiness for End-2016 Deadline for L4 Connection, K. Hanke |
07.05.2015 | PS Booster Upgrade Working Group Meeting 148 | (Agenda) | (Minutes) | Collect Needs for Cooling And Ventilation, S. Moccia, Racks Space Allocation Layout of BRF2/BAT D. Hay |
30.04.2015 | PS Booster Upgrade Working Group Meeting 147 | (Agenda) | (Minutes) | LIU-PSB Templates, G.P. Di Giovanni, Requests to EN/EL for the LIU-PSB, G.M. Georgiev and J. Devine |
16.04.2015 | PS Booster Upgrade Working Group Meeting 146 | (Agenda) | (Minutes) | List of BI Open Actions, G.P. Di Giovanni, Activities YETS15-16 and Progress on LIU-PSB Upgrade Activities, D. Hay, Collect Needs for Cooling And Ventilation, S. Moccia, Collect Needs for Cabling, G. Minchev-Georgiev, Qstrips Power Converters Specifications, L. De Mallac |
26.03.2015 | PS Booster Upgrade Working Group Meeting 145 | (Agenda) | (Minutes) | Items Needed for L4 Connection, K. Hanke, LIU BI.DIS Rise Time, L. Sermeus, Measurement of the Current KFA Rise Time, L. Sermeus, EN-MEF-SU Open Actions, T. Dobers |
12.03.2015 | PS Booster Upgrade Working Group Meeting 144 | (Agenda) | (Minutes) | POPS-B, F. Boattini |
26.02.2015 | PS Booster Upgrade Working Group Meeting 143 | (Agenda) | (Minutes) | Review of the readiness for the end-2016 deadline for the equipment for Linac4 connection. |
12.02.2015 | PS Booster Upgrade Working Group Meeting 142 | (Agenda) | (Minutes) | End-2016 Readiness for the Equipment for Linac4, K. Hanke, POPS-B, F. Boattini, Status of the Half Sector Test, B. Mikulec |
29.01.2015 | PS Booster Upgrade Working Group Meeting 141 | (Agenda) | (Minutes) | Review of the BI Equipment Installed for the LIU-PSB Upgrade, J. Tan |
15.01.2015 | PS Booster Upgrade Working Group Meeting 140 | (Agenda) | (Minutes) | MADX and Aperture Studies for the BI Transfer Line, C. Bracco |
04.12.2014 | PS Booster Upgrade Working Group Meeting 139 | (Agenda) | (Minutes) | Handling System for the PSB Reference Magnet in B361, C. Bertone, Impact of Placing the PSB Reference Magnet in B245, F. Boattini |
27.11.2014 | PS Booster Upgrade Working Group Meeting 138 | (Agenda) | (Minutes) | Status Report on the Integration of the PSB-PS Transfer Lines, J.-M. Lacroix |
13.11.2014 | PS Booster Upgrade Working Group Meeting 137 | (Agenda) | (Minutes) | Functional Specifications Review for the Stripping Foil BSW Magnets Power Converters, D. Aguglia |
06.11.2014 | PS Booster Upgrade Working Group Meeting 136 | (Agenda) | (Minutes) | Aperture Study on the PSB Extraction and Recombination Lines, J. Abelleira, LIU-PSB Updated Budget Profiles K. Hanke & G.P. Di Giovanni |
30.10.2014 | PS Booster Upgrade Working Group Meeting 135 | (Agenda) | (Minutes) | H- Injection into the ISIS Synchrotron, B. Jones. Extras: Image of foil change area at ISIS and ISIS Foil Change Procedure |
16.10.2014 | PS Booster Upgrade Working Group Meeting 134 | (Agenda) | (Minutes) | PSB Reference Magnet, A. Newborough, and Booster B-train system upgrade, M. Buzio |
09.10.2014 | PS Booster Upgrade Working Group Meeting 133 | (Agenda) | (Minutes) | LIU-PSB Budget Review, G.P. Di Giovanni & K. Hanke, LIU-PSB Configuration Management, T. Birtwistle. |
25.09.2014 | PS Booster Upgrade Working Group Meeting 132 | (Agenda) | (Minutes) | Building 245 - Civil engineering budget, A. Lopez-Hernandez and Rack Space Report, D. Hay. |
04.09.2014 | PS Booster Upgrade Working Group Meeting 131 | (Agenda) | (Minutes) | BLMs integration in PSB H- injection system, B.Riffaud |
21.08.2014 | PS Booster Upgrade Working Group Meeting 130 | (Agenda) | (Minutes) | LIU-PSB Work Breakdown Structure, K.Hanke |
24.07.2014 | PS Booster Upgrade Working Group Meeting 129 | (Agenda) | (Minutes) | Aperture Checks for Different Linac4 Transfer Line Optics, C.Bracco |
10.07.2014 | PS Booster Upgrade Working Group Meeting 128 | (Agenda) | (Minutes) | |
26.06.2014 | PS Booster Upgrade Working Group Meeting 127 | (Agenda) | (Minutes) | Handling of Critical Items for Transportation, J-L. Grenard |
12.06.2014 | PS Booster Upgrade Working Group Meeting 126 | (Agenda) | (Minutes) | Localisation of Beam Losses in PSB, M. Kowalska, BLM Electronics Status, C. Zamantzas |
22.05.2014 | PS Booster Upgrade Working Group Meeting 125 | (Agenda) | (Minutes) | Updated Status of the Impedance Model for the PSB, C.Zannini |
08.05.2014 | PS Booster Upgrade Working Group Meeting 124 | (Agenda) | (Minutes) | New Optics of the PSB measurement line (BTM), W. Bartmann/J. Abelleira Fernandez |
24.04.2014 | PS Booster Upgrade Working Group Meeting 123 | (Agenda) | (Minutes) | MDs Planning for 2014, E. Benedetto |
10.04.2014 | PS Booster Upgrade Working Group Meeting 122 | (Agenda) | (Minutes) | |
27.03.2014 | PS Booster Upgrade Working Group Meeting 121 | (Agenda) | (Minutes) | New Cooling strategy for the B245, F. Boattini, M. Obrecht |
13.02.2014 | PS Booster Upgrade Working Group Meeting 120 | (Agenda) | (Minutes) | Optics Measurements in the PSB, M. McAteer |
30.01.2014 | PS Booster Upgrade Working Group Meeting 119 | (Agenda) | (Minutes) | Building 245 project update, F. Boattini |
23.01.2014 | PS Booster Upgrade Working Group Meeting 118 | (Agenda) | (Minutes) | W. Weterings, New baseline design for the H0/H- beam dump |
16.01.2014 | PS Booster Upgrade Working Group Meeting 117 | (Agenda) | (Minutes) | |
12.12.2013 | PS Booster Upgrade Working Group Meeting 116 | (Agenda) | (Minutes) | |
05.12.2013 | PS Booster Upgrade Working Group Meeting 115 | (Agenda) | (Minutes) | D. Hay, PSB Cranes renovation/replacement |
07.11.2013 | PS Booster Upgrade Working Group Meeting 114 | (Agenda) | (Minutes) | Bulding 245 schedule update |
24.10.2013 | PS Booster Upgrade Working Group Meeting 113 | (Agenda) | (Minutes) | Status of the RF |
10.10.2013 | Review of the PSB Ejection Lines @2GeV | (Agenda) | (Minutes) | Optics of the Ejection Lines @2GeV and potential impact on hardware |
09.10.2013 | PSB injection sectorisation vs dump design | (Minutes) | ||
26.09.2013 | PS Booster Upgrade Working Group Meeting 112 | (Agenda) | (Minutes) | Beam dynamic: Inconel vacuum chamber |
19.09.2013 | PS Booster Upgrade Working Group Meeting 111 | (Agenda) | (Minutes) | PSB H- Injection Vacuum Sectorisation |
12.09.2013 | PS Booster Upgrade Working Group Meeting 110 | (Agenda) | (Minutes) | |
22.08.2013 | PS Booster Upgrade Working Group Meeting 109 | (Agenda) | (Minutes) | PSB Realignment Campaign |
15.08.2013 | PS Booster Upgrade Working Group Meeting 108 | (Agenda) | (Minutes) | BLM cabling non-conformities |
08.08.2013 | PS Booster Upgrade Working Group Meeting 107 | (Agenda) | (Minutes) | Configuration Management & ECRs |
04.07.2013 | PS Booster Upgrade Working Group Meeting 106 | (Agenda) | (Minutes) | Report on ALARA committee and Status of New Main Dump |
27.06.2013 | PS Booster Upgrade Working Group Meeting 105 | (Agenda) | (Minutes) | BTM Optics sutdies, Upgrade study of magnet BTM.BHZ 10 |
13.06.2013 | PS Booster Upgrade Working Group Meeting 104 | (Agenda) | (Minutes) | Rack space in 361, H0/H- review summary |
30.05.2013 | PS Booster Upgrade Working Group Meeting 103 | (Agenda) | (Minutes) | Inconel vacuum chamber for injection section, Multipolar Effects, E.Benedetto, Impedance calculation, C. Zannini, Status of the layout, B. Riffaud |
16.05.2013 | PS Booster Upgrade Working Group Meeting 102 | (Agenda) | (Minutes) | Design of BI.DHZ.DVT50/BI.DHZ.DVT70, L. Vanherpe |
25.04.2013 | PS Booster Upgrade Working Group Meeting 101 | (Agenda) | (Minutes) | PSB with Linac 4 - RF matching, A. Blas |
18.04.2013 | Review on the H-/H0 dumps | (Agenda) | (Minutes) | H0/H- dumps, H0/H- instrumentation, Vacuum systems, Radio protection |
11.04.2013 | PS Booster Upgrade Working Group Meeting 100 | (Agenda) | (Minutes) | Status of the New PSB Main Dump; Dismantling of the Old PSB Dump |
14.03.2013 | PS Booster Upgrade Working Group Meeting 99 | (Agenda) | (Minutes) | Injection Aperture Limitations, C. Bracco |
07.03.2013 | PS Booster Upgrade Working Group Meeting 98 | (Agenda) | (Minutes) | LLRF : PSB ring inhibit in the Linac4 area, A. Blas |
28.02.2013 | PS Booster Upgrade Working Group Meeting 97 | (Agenda) | (Minutes) | Beam Interlock System for transfer line and PSB, C. Martin |
14.02.2013 | PS Booster Upgrade Working Group Meeting 96 | (Agenda) | (Minutes) | Design of Booster Injection Quadrupole magnets, A. Aloev |
07.02.2013 | PS Booster Upgrade Working Group Meeting 95 | (Agenda) | (Minutes) | Optic Transfer Line L4 to PSB, A. Lombardi |
31.01.2013 | PS Booster Upgrade Working Group Meeting 94 | (Agenda) | (Minutes) | |
17.01.2013 | PS Booster Upgrade Working Group Meeting 93 | (Agenda) | (Minutes) | |
13.12.2012 | PS Booster Upgrade Working Group Meeting 92 | (Agenda) | (Minutes) | |
29.11.2012 | PS Booster Upgrade Working Group Meeting 91 | (Agenda) | (Minutes) | Head/Tails and H-/H0 dumps dedicated meeting |
22.11.2012 | PS Booster Upgrade Working Group Meeting 90 | (Agenda) | (Minutes) | PSB Dump Replacement - Strategy and Status, A. Sarrió |
08.11.2012 | PS Booster Upgrade Working Group Meeting 89 | (Agenda) | (Minutes) | SMIT vs. TRIUMF magnets for Booster Inj. Line, A. Aloev |
25.10.2012 | PS Booster Upgrade Working Group Meeting 88 | (Agenda) | (Minutes) | |
11.10.2012 | PS Booster Upgrade Working Group Meeting 87 | (Agenda) | (Minutes) | Timeline H- Injection, W. Weterings |
04.10.2012 | PS Booster Upgrade Working Group Meeting 86 | (Agenda) | (Minutes) | |
20.09.2012 | PS Booster Upgrade Working Group Meeting 85 | (Agenda) | (Minutes) | Follow-up of the PSB dump review |
13.09.2012 | PS Booster Upgrade Working Group Meeting 84 | (Agenda) | (Minutes) | MPS planning, F. Boattini |
30.08.2012 | PS Booster Upgrade Working Group Meeting 83 | (Agenda) | (Minutes) | Review of the PSB Dump |
16.08.2012 | PS Booster Upgrade Working Group Meeting 82 | (Agenda) | (Minutes) | |
26.07.2012 | PS Booster Upgrade Working Group Meeting 81 | (Agenda) | (Minutes) | BTV prototype at the stripping foil, A. Ravni |
19.07.2012 | PS Booster Upgrade Working Group Meeting 80 | (Agenda) | (Minutes) | Integration of the Injection Region, J-M Lacroix |
05.07.2012 | PS Booster Upgrade Working Group Meeting 79 | (Agenda) | (Minutes) | MPS for PSB - preliminary design and planning |
21.06.2012 | PS Booster Upgrade Working Group Meeting 78 | (Agenda) | (Minutes) | Review on shorter PSB main dipole magnets |
14.06.2012 | PS Booster Upgrade Working Group Meeting 77 | (Agenda) | (Minutes) | PSB dump cooling (RP recommendations, CV), PSB dump design status, Procedures for dump dismantling |
31.05.2012 | PS Booster Upgrade Working Group Meeting 76 | (Agenda) | (Minutes) | LS1 work and cabling requests |
24.05.2012 | PS Booster Upgrade Working Group Meeting 75 | (Agenda) | (Minutes) | |
10.05.2012 | PS Booster Upgrade Working Group Meeting 74 | (Agenda) | (Minutes) | OP priority list for BI |
03.05.2012 | PS Booster Upgrade Working Group Meeting 73 | (Agenda) | (Minutes) | BT.BHZ10 Upgrade, W. Bartmann, A. Newborough (slides) |
26.04.2012 | PS Booster Upgrade Working Group Meeting 72 | (Agenda) | (Minutes) | Internal H0/H- dump, M. Delonca (slides) |
19.04.2012 | PS Booster Upgrade Working Group Meeting 71 | (Agenda) | (Minutes) | |
05.04.2012 | PS Booster Upgrade Working Group Meeting 70 | (Agenda) | (Minutes) | PSB magnetic cycle 900 ms, A. Blas(slides) |
29.03.2012 | PS Booster Upgrade Working Group Meeting 69 | (Agenda) | (Minutes) | Update on PSB Injection with Linac4 |
22.03.2012 | PS Booster Upgrade Working Group Meeting 68 | (Agenda) | (Minutes) | |
15.03.2012 | PS Booster Upgrade Working Group Meeting 67 | (Agenda) | (Minutes) | Update on PSB Injection with Linac4 |
01.03.2012 | PS Booster Upgrade Working Group Meeting 66 | (Agenda) | (Minutes) | Sensitivity study of BLMs to beam losses, S.Damjanovic(here); Cabling strategies, J-C.Guillaume(here) |
23.02.2012 | PS Booster Upgrade Working Group Meeting 65 | (Agenda) | (Minutes) | Update on PSB Injection with Linac4 |
16.02.2012 | PS Booster Upgrade Working Group Meeting 64 | (Agenda) | (Minutes) | RP-Cooling circuit for future PSB dump, R. Froeschl (here) |
02.02.2012 | PS Booster Upgrade Working Group Meeting 63 | (Agenda) | (Minutes) | Planning for the new PSB dump, S. Mathot (here) |
26.01.2012 | PS Booster Upgrade Working Group Meeting 62 | (Agenda) | (Minutes) | Update on PSB Injection with Linac4 |
19.01.2012 | PS Booster Upgrade Working Group Meeting 61 | (Agenda) | (Minutes) | Preliminary design of the dump, A. Sarrió Martinez (slides) |
12.01.2012 | PS Booster Upgrade Working Group Meeting 60 | (Agenda) | (Minutes) | Prioritization of cabling needs, P. Bonnal (slides) |
08.12.2011 | PS Booster Upgrade Working Group Meeting 59 | (Agenda) | (Minutes) | |
01.12.2011 | PS Booster Upgrade Working Group Meeting 58 | (Agenda) | (Minutes) | |
17.11.2011 | PS Booster Upgrade Working Group Meeting 57 | (Agenda) | (Minutes) | PSB dump replacement, A. Sarrió Martinez (slides) |
03.11.2011 | PS Booster Upgrade Working Group Meeting 56 | (Agenda) | (Minutes) | |
20.10.2011 | PS Booster Upgrade Working Group Meeting 55 | (Agenda) | (Minutes) | |
13.10.2011 | PS Booster Upgrade Working Group Meeting 54 | (Agenda) | (Minutes) | Beam sizes for the BTM dump, W. Bartmann (slides) |
06.10.2011 | PS Booster Upgrade Working Group Meeting 53 | (Agenda) | (Minutes) | Study to replace on BT.BHZ10 and on new optics on extraction line, W. Bartmann (slides) |
29.09.2011 | PS Booster Upgrade Working Group Meeting 52 | (Agenda) | (Minutes) | |
15.09.2011 | PS Booster Upgrade Working Group Meeting 51 | (Agenda) | (Minutes) | |
01.09.2011 | PS Booster Upgrade Working Group Meeting 50 | (Agenda) | (Minutes) | RF renovation planning, M. Poaluzzi (slides) |
18.08.2011 | PS Booster Upgrade Working Group Meeting 49 | (Agenda) | (Minutes) | |
11.08.2011 | PS Booster Upgrade Working Group Meeting 48 | (Agenda) | (Minutes) | |
21.07.2011 | PS Booster Upgrade Working Group Meeting 47 | (Agenda) | (Minutes) | |
30.06.2011 | PS Booster Upgrade Working Group Meeting 46 | (Agenda) | (Minutes) | |
23.06.2011 | PS Booster Upgrade Working Group Meeting 45 | (Agenda) | (Minutes) | |
16.06.2011 | PS Booster Upgrade Working Group Meeting 44 | (Agenda) | (Minutes) | |
09.06.2011 | PS Booster Upgrade Working Group Meeting 43 | (Agenda) | (Minutes) | Introduction to WBS, J. de Jonghe (slides) |
26.05.2011 | PS Booster Upgrade Working Group Meeting 42 | (Agenda) | (Minutes) | BTY @ 2GeV, D. Voulot (slides) |
19.05.2011 | PS Booster Upgrade Working Group Meeting 41 | (Agenda) | (Minutes) | |
12.05.2011 | PS Booster Upgrade Working Group Meeting 40 | (Agenda) | (Minutes) | KSW Pulse form with Linac4 injection, C. Bracco(slides); RCS Lattice Option , M. Fitterer(slides) |
05.05.2011 | PS Booster Upgrade Working Group Meeting 39 | (Agenda) | (Minutes) | |
28.04.2011 | PS Booster Upgrade Working Group Meeting 38 | (Agenda) | (Minutes) | |
21.04.2011 | PS Booster Upgrade Working Group Meeting 37 | (Agenda) | (Minutes) | RCS design choices, H. Schoenauer (slides) |
14.04.2011 | PS Booster Upgrade Working Group Meeting 36 | (Agenda) | (Minutes) | PS 2GeV Injection – Feasible?, W. Bartmann(slides) |
07.04.2011 | PS Booster Upgrade Working Group Meeting 35 | (Agenda) | (Minutes) | Update on RCS lattice design, M.Fitterer(slides); RCS Preliminary beam transfer considerations, B. Goddard(slides) |
31.03.2011 | PS Booster Upgrade Working Group Meeting 34 | (Agenda) | (Minutes) | 2 GeV protons for ISOLDE, T. Stora(slides) |
24.03.2011 | PS Booster Upgrade Working Group Meeting 33 | (Agenda) | (Minutes) | |
17.03.2011 | PS Booster Upgrade Working Group Meeting 32 | (Agenda) | (Minutes) | |
10.03.2011 | PS Booster Upgrade Working Group Meeting 31 | (Agenda) | (Minutes) | |
24.02.2011 | PS Booster Upgrade Working Group Meeting 30 | (Agenda) | (Minutes) | |
17.02.2011 | PS Booster Upgrade Working Group Meeting 29 | (Agenda) | (Minutes) | |
10.02.2011 | PS Booster Upgrade Working Group Meeting 28 | (Agenda) | (Minutes) | Advanced Connection of Linac4 to PSB, W. Weterings, J. Borburgh (slides) |
03.02.2011 | PS Booster Upgrade Working Group Meeting 27 | (Agenda) | (Minutes) | Upgrade of Vacuum System, E. Mahner (slides) |
13.01.2011 | PS Booster Upgrade Working Group Meeting 26 | (Agenda) | (Minutes) | |
09.12.2010 | L4BCC on PSB Injection | (Agenda) | (Minutes) | |
02.12.2010 | PS Booster Upgrade Working Group Meeting 25 | (Agenda) | (Minutes) | PSB Injection Modifications, W. Weterings (slides) |
01.12.2010 | Workshop of the LIU Project | (Agenda) | (Minutes) | |
18.11.2010 | PS Booster Upgrade Working Group Meeting 24 | (Agenda) | (Minutes) | Upgrade of Electrical System, S. Olek (slides) |
04.11.2010 | PS Booster Upgrade Working Group Meeting 23 | (Agenda) | (Minutes) | |
21.10.2010 | PS Booster Upgrade Working Group Meeting 22 | (Agenda) | (Minutes) | |
07.10.2010 | PS Booster Upgrade Working Group Meeting 21 | (Agenda) | (Minutes) | Alternative for Booster MPS, S. Pittet (slides) |
16.09.2010 | PS Booster Upgrade Working Group Meeting 20 | (Agenda) | (Minutes) | Alternative Magnetic Cycles, C. Carli (slides); Magnet Tests in SM 18, A. Newborough (slides) |
02.09.2010 | PS Booster Upgrade Working Group Meeting 19 | (Agenda) | (Minutes) | Report on MD Results and Implications on PSB Upgrade, G. Rumolo (slides) |
26.08.2010 | PS Booster Upgrade Working Group Meeting 18 | (Agenda) | (Minutes) | |
29.07.2010 | PS Booster Upgrade Working Group Meeting 17 | (Agenda) | (Minutes) | |
15.07.2010 | PS Booster Upgrade Working Group Meeting 16 | (Agenda) | (Minutes) | Damping Resistors on PSB Bending Magnets, A. Newborough (slides) |
01.07.2010 | PS Booster Upgrade Working Group Meeting 15 | (Agenda) | (Minutes) | |
24.06.2010 | PS Booster Upgrade Working Group Meeting 14 | (Agenda) | (Minutes) | Expected Beam Loss Figures and Cures, G. Rumolo, S. Gilardoni (slides) |
17.06.2010 | PS Booster Upgrade Working Group Meeting 13 | (Agenda) | (Minutes) | PS Low Energy Magnets, S. Gilardoni (slides) |
10.06.2010 | PS Booster Upgrade Working Group Meeting 12 | (Agenda) | (Minutes) | |
03.06.2010 | PS Booster Upgrade Working Group Meeting 11 | (Agenda) | (Minutes) | |
12.05.2010 | PS Booster Upgrade Working Group Meeting 10 | (Agenda) | (Minutes) | |
06.05.2010 | PS Booster Upgrade Working Group Meeting 9 | (Agenda) | (Minutes) | |
29.04.2010 | PS Booster Upgrade Working Group Meeting 8 | (Agenda) | (Minutes) | Magnetic Cycle from 50 MeV to 2 GeV, A. Blas (slides) |
15.04.2010 | PS Booster Upgrade Working Group Meeting 7 | (Agenda) | (Minutes) | |
08.04.2010 | PS Booster Upgrade Working Group Meeting 6 | (Agenda) | (Minutes) | |
01.04.2010 | PS Booster Upgrade Working Group Meeting 5 | (Agenda) | (Minutes) | |
25.03.2010 | PS Booster Upgrade Working Group Meeting 4 | (Agenda) | (Minutes) | |
18.03.2010 | PS Booster Upgrade Working Group Meeting 3 | (Agenda) | (Minutes) | Results on Showstopper Identification (slides) |
11.03.2010 | PS Booster Upgrade Working Group Meeting 2 | (Agenda) | (Minutes) | First Status Report on Show Stoppers for PSB 2 GeV Upgrade (slides) |
04.03.2010 | PS Booster Upgrade Working Group Meeting 1 | (Agenda) | (Minutes) |
Date | Title | Minutes |
---|---|---|
01.06.2018 | Linac4-to -PSB Injection Scheme and Linac4 Feed-Forward Algorithm | Minutes |
24.05.2018 | Discussion about the KSW/BSW/Bdl/QSTRIP Synchronisation at PSB Injection | Agenda and Minutes |
01.09.2017 | Discussion on the Upcoming Vacuum Test for the LS2 Head and Tail Dumps | (Minutes) |
08.06.2017 | Upgrade of PSB Cooling Station | (Minutes) |
31.05.2017 | Follow up on Building 245 | (Minutes) |
I | Attachment | History | Action | Size | Date | Who | Comment |
---|---|---|---|---|---|---|---|
PSB_RFrenovation_01092011.pdf | r1 | manage | 239.3 K | 2011-09-05 - 11:56 | VivienRaginel |