Computer Centre Upgrade for LHC Computing

Vault Conversion

Additional raised floor is required in the long term for the LHC offline farms, but also in the short term to equipment to be installed elsewhere whilst the machine room is being upgraded. Various alternative solutions were investigated (e.g. using the barn or installing mezzanines), but converting the vault to a machine room was the best alternative.

There have been 4 major components to this conversion:

  1. Removal of IT's tape robots and the archived 3480 cartridges
  2. Removal of all the old infrastructure (air conditioning ducts, electrical distribution, ...)
  3. Some heavy civil engineering to remodel the vault and to create additional storage areas.
  4. Installation of the new infrastructure.


 